The work I did was to prepare a document called the Pickering draft plan, which outlined what the project would be. I summarized the number of technical studies and made it into a readable public document.
I also prepared a draft document of the project description, which was the document that would have been used to launch an environmental assessment, but the board of the GTAA determined that we should not proceed with that project.