The assessments were done case by case, so each of those assessments were provided individually. They are fairly long and complex technical documents over very long routes in some cases, so they are quite bulky. The assessment was done in terms of each of those different ones, so as the assessments information was converted into changes to the system, I'm not sure we have a summary that would be easily available.
On March 21st, 2016. See this statement in context.