Thank you very much.
Thank you for the invitation to appear before the Standing Committee on Transport, Infrastructure and Communities to testify regarding your study on adapting infrastructure to face climate change in Canada.
I am pleased to address you from the city of Merritt and also from the traditional, ancestral and unceded lands of Nlaka'pamux and Syilx people.
Today I speak to you from a community that, in 2021, experienced record heat domes, two wildfires at our gates and, last, major flooding from atmospheric rivers in the month of November. More than 400 properties were affected by flood water, and the entire town of 7,500 was evacuated at 3 a.m. due to the failure of our water and waste treatment systems. I have to say that the recovery of our community has been inspiring and steady, with roads, infrastructure and private residences being repaired back to livable conditions.
However, from a flood mitigation perspective, our flood mitigation infrastructure is in substantially the same position as it was on the morning of November 16, 2021. We acknowledge that we are open to future flood risk. Until that changes, the tension of our residents is palpable and, as of today, we are at a level one flood risk with rapidly melting snowcaps. We are testing temporary dikes and dikes that were built by the military almost two years ago.
I have some recommendations that I would like to put forward, if I may. The City of Merritt has completed its flood mitigation plan and will be applying for the DMAF, which stands for disaster mitigation and adaptation funding. However, the program specifically excludes land acquisition as an eligible cost. Specifically, the program should make eligible the acquisition of land and buildings necessary to build mitigation infrastructure on. Without this, we are working with the province to come up with funding models that would allow us to acquire the land separate from the DMAF. This takes time and leads to substantial uncertainty for communities. Further, the DMAF program was not open to intake until January 2023, so there was no clear avenue to apply for potential flood mitigation and infrastructure funding for over 13 months.
My recommendation is that the inclusion of land acquisition in the disaster mitigation and adaptation program be looked at.
Floods are measured by how often certain volumes of water are experienced over time such as one-in-10 years, one-in-50 years or one-in-200 years. The challenge that we have with this is that, moving forward, we acknowledge that climate change has necessitated the need to rethink old flood levels. In our community, there was three times more water in the 2021 flood than there had ever been in the Coldwater River in the previous 50 years. The climate change adjustment for flood levels completely varies between communities. There is no standardization of the plan.
My recommendation is to establish best practices for climate change adjustments to return period calculations to the Q200 level and that the federal government produce guidelines for stabilization or standardization of climate change adjustments as part of the return period calculations.
A vast majority of our residents in zones 3 and 4, the flood-affected areas, either did not have overland water insurance or, in some cases, were under-insured completely. Many were outright denied coverage for a myriad of reasons. Most lost everything, including their homes and their lifetimes of memories. My recommendation is that the federal government and this committee expedite the flood insurance program to improve available, affordable and reliable flood insurance.
The DFAA program makes available 15% of eligible-event DFAA costs. These are commonly referred to as build back better funds. However, the program is designed so that these funds are advanced to the province only after the total cost of the event is known and a report is sent to the province requesting the funds. This means that the funds may be advanced years after the event. If the goal is to build back better, funds need to be made available as recovery projects to build bridges, raise roads, etc., are being completed, not after.
My recommendation is that the build back better program be refined to allow immediate payment to the province so that funds can be used to support improved projects during the recovery phase.
Last, the City of Merritt evacuated 7,500 people on the evening of November 16, but we also had 1,000 citizens from the city of Lytton, which had been burnt out in the previous wildfire, so it was close to 8,500. It could have been limited to 400 to 500 people affected in zones 3 and 4, which, in fact, flooded, but zones 1 and 2 would not have been evacuated if it weren't for the vulnerability in the city's water and waste treatment systems, which were flooded due to the fact that these systems are gravity-fed and in the lowest area of the city.
My recommendation is that the federal government support funding programs designed to mitigate risks for critical infrastructure for communities at risk. A proactive plan, rather than a reactive plan, may have cut recovery costs by millions.
Had this been in place—and I will be very brief—to protect our fresh water and our sewer plant, we would have evacuated only two parts of the community. My home was flooded, and I sent my family to one of my relatives in zone 2. Unfortunately, in the evacuation, my granddaughter was killed on the highway. She died in an accident. My other granddaughter was severely injured. Had we had the ability to protect the sewer plant, things would have been different for us.
I hope this committee takes these things into consideration. I apologize for my emotions.