We're at a fairly early stage in the process. The estimate we would share would be pre-FID. We're not talking about potential cost overruns but about evaluating the best estimate, which we don't have at this point in time. However, the concern is legitimate, considering, of course, that everyone is following what's happening on the construction site.
One of the particular aspects of the process that was suggested to us as a codevelopment is that, instead of having only the private sector or only a Crown corporation isolated to work in defining the scope, the mandate we have is to take adequate time and apply the right resources to pin down the right scope for Canadians and ensure that what we build is at the right cost and is affordable but is also economical for the future.
Cost is one thing, but—