Thank you very much for the question and the opportunity to respond.
I think when we look at grain in particular, one of the biggest challenges with the Port of Vancouver is this persistent problem of delays throughout our supply chain that are caused when the loading of grain onto vessels by the grain terminal operators is interrupted or suspended during periods of inclement weather, such as rain or snow. Of course, there's frequently rain in Vancouver through the winter period, which tends to be when grain demand is at its peak. When there is a delay in any part of the grain supply chain like that, there will be cascading consequences through the entire system.
For example, just the week before last, there were heavy rains in Vancouver over about a two-day period. We had approximately 650 loaded hopper cars full of grain that were delayed getting unloaded at six grain terminals, because the terminals had suspended loading of grain onto vessels.
When it comes to those kinds of delays, frankly, ports around the world have figured out how to keep grain loading happen uninterrupted, regardless of weather. Ports just south of Vancouver, such as Seattle and Portland, have grain terminals that load grain throughout different inclement weather. This is a challenge that needs to be solved in Canada. Anything that interrupts the smooth, efficient, balanced and synchronized cycling of railcar functioning from the in-country elevator to the port and then back to origin—essentially, it's a conveyor belt that the whole system is running—will cause all sorts of consequences for the supply chain. It will undermine the overall performance and throughput of Canada's grain export supply chain.