Mr. Speaker, the North Bay Jack Garland Airport is currently one of only 15 airports in Canada which boasts a 10,000 foot runway and it is used as an official alternate landing site for instances when flights are unable to land in Toronto or Montreal.
Runway 08/26 is nearing the end of its lifespan and requires resurfacing. Rather than resurfacing, Transport Canada wants to reduce the runway to 6,500 feet. It is worth noting that according to current estimates, the cost of reducing the runway length from 10,000 feet to 6,500 feet is significantly more expensive than maintaining the current length.
The importance of maintaining the runway cannot be overstated. Not only does it provide for a safe, reliable alternate landing site, but it also provides endless potential for economic growth throughout Nipissing—Timiskaming.
The new Minister of Transport, Infrastructure and Communities must review this matter carefully and pledge his support for the resurfacing of the full 10,000 foot runway at North Bay Jack Garland Airport.