Mr. Speaker, I think it is really important to take a very clear look at this situation.
The reactor is on an extended safe shutdown for the reasons that it is unsafe to operate. It was something that could not be anticipated nor predicted. Indeed, this reactor has been producing reliably over 90% for the last number of years.
Indeed, there was another alternative in MAPLE-1 and MAPLE-2. It was cancelled in 2008 because it did not produce a single isotope. As indicated before--