House of Commons Hansard #180 of the 41st Parliament, 1st Session. (The original version is on Parliament's site.) The word of the day was firefighters.

Topics

Experimental Lakes AreaPetitionsRoutine Proceedings

3:10 p.m.

NDP

Fin Donnelly NDP New Westminster—Coquitlam, BC

Mr. Speaker, I rise today to present a petition from thousands of Canadians to save the ELA, Canada's leading freshwater research station. The petitioners call upon the Government of Canada to recognize the importance of the ELA to its mandate to study, preserve and protect aquatic ecosystems, to reverse the decision to close the ELA research station and to continue to staff and provide financial resources to the ELA at the current or a higher level of commitment.

Experimental Lakes AreaPetitionsRoutine Proceedings

3:10 p.m.

Conservative

Harold Albrecht Conservative Kitchener—Conestoga, ON

Mr. Speaker, I rise to present petitions from Kitchener-Waterloo and Guelph calling upon the government to provide financial resources to the ELA at the current or a higher level of commitment.

Agriculture and Agri-FoodPetitionsRoutine Proceedings

3:10 p.m.

Liberal

Ralph Goodale Liberal Wascana, SK

Mr. Speaker, I have three petitions to file today. One is from the Yorkton—Melville part of Saskatchewan; a second from the western part of Saskatchewan around Kindersley and Lloydminster; and a third from all over the province, including Regina, Saskatoon, Leader, Theodore, Insinger and a whole variety of other places.

All three petitions relate to the historic tree farm at Indian Head. The petitioners call upon the government to reverse its decision to stop funding the tree farm and to provide adequate resources for the prairie shelterbelt program to continue, including adequate resources for the tree farm at Indian Head.

HousingPetitionsRoutine Proceedings

3:10 p.m.

NDP

Marie-Claude Morin NDP Saint-Hyacinthe—Bagot, QC

Mr. Speaker, I am pleased to rise today to present another petition signed by people from across Canada, people of all ages and social classes, who want the government to take action and create a national housing strategy. These people also support my bill, Bill C-400.

Access to MedicinesPetitionsRoutine Proceedings

3:10 p.m.

Liberal

Mauril Bélanger Liberal Ottawa—Vanier, ON

Mr. Speaker, I would like to table a petition on behalf of hundreds of Canadians, many of them from Ottawa but also from the western provinces, B.C. and Manitoba in particular. The petition is by the Grandmothers Advocacy Network encouraging members of this House and the government in particular to support Bill C-398, a bill to amend Canada's access to medicine regime to allow people in Africa, principally but not only there, who suffer from treatable diseases such as HIV-AIDS, malaria and tuberculosis to receive medicines that are not priced exorbitantly. The petition also encourages those members who voted in the past for Bill C-393, which passed the House but did not get through the Senate, to consider supporting Bill C-398.

PensionsPetitionsRoutine Proceedings

3:10 p.m.

NDP

Irene Mathyssen NDP London—Fanshawe, ON

Mr. Speaker, I have a petition from a number of citizens across the country, including Fredericton, Sackville and Saskatoon. They are concerned about the changes to old age security and the fact that the age of eligibility has been increased from 65 to 67. They believe this will have an impact on the poorest seniors in this country. Therefore, they ask the Government of Canada to maintain the age of eligibility for OAS at 65 and to make required investments in the guaranteed income supplement to lift every senior in this country out of poverty.

Experimental Lakes AreaPetitionsRoutine Proceedings

3:15 p.m.

Independent

Bruce Hyer Independent Thunder Bay—Superior North, ON

Mr. Speaker, I have two petitions today. The first is yet another petition, this time on behalf of residents of Quebec, regarding the government's closure of the Experimental Lakes Area in northwestern Ontario. Closing that world renowned freshwater science facility would jeopardize unique research.

TelecommunicationsPetitionsRoutine Proceedings

3:15 p.m.

Independent

Bruce Hyer Independent Thunder Bay—Superior North, ON

Mr. Speaker, the second petition is in regard to my cellphone freedom act, Bill C-343. People from across Ontario ask us to support the cellphone freedom act, which would remove anti-competitive network locks on their cellular phones.

PensionsPetitionsRoutine Proceedings

3:15 p.m.

Liberal

Kevin Lamoureux Liberal Winnipeg North, MB

Mr. Speaker, on behalf of the residents of Winnipeg North, it is a pleasure to table a petition calling upon the Prime Minister to recognize that my constituents, and indeed all Canadians, should continue to have the option of retiring at age 65. They call upon the government to reverse its decision, emphasizing the importance of our OAS, GIS and CPP as fundamental social programs that Canadians believe in. They want a government that will support those programs.

Questions on the Order PaperRoutine Proceedings

November 19th, 2012 / 3:15 p.m.

Regina—Lumsden—Lake Centre Saskatchewan

Conservative

Tom Lukiwski ConservativeParliamentary Secretary to the Leader of the Government in the House of Commons

Mr. Speaker, the following questions will be answered today: Nos. 899, 900, 904, 916, 924, 928, 929, 933, 934, 938, 940, 947, 949 and 950.

Question No. 899Questions on the Order PaperRoutine Proceedings

3:15 p.m.

NDP

Hoang Mai NDP Brossard—La Prairie, QC

With regard to the proposed new bridge on the St. Lawrence River: (a) why did the 2012 budget not include long-term planning for the proposed bridge; (b) have the cost estimates been further refined since initial estimates of between three and five billion dollars were made, and how are these estimated costs broken down, in as much detail as possible; (c) what further factors need to be taken into account to refine the estimates; (d) at what time in the financial analysis process will the Treasury Board of Canada or the Department of Finance be involved and to what extent; (e) has Transport Canada chosen the funding model and, if so, which one, and why; (f) will there be any public consultation concerning the funding model; (g) have any economic models been created to understand the financial impacts of the various options for the project; (h) is public-private partnership (P3) still an option (i) who is involved in making the decision about P3, (ii) have there been concrete steps made in order to finalize a decision, (iii) will there be any public consultation regarding P3; (i) has Transport Canada decided on the type of structure (bridge or tunnel); (j) what are the initial outcomes of the government’s collaboration with the province of Québec to integrate transit onto the new bridge; (k) has Transport Canada been involved in the study of integrating a Light Rail Transit (LRT) onto the bridge, (i) at what stage in the planning process will the government define the parameters of public transportation on the bridge, (ii) how is the government coordinating the planning process with the government of Québec, the Agence métropolitaine de transport and other interested parties, (iii) when are the results of this study expected and will they be made public, (iv) is the LRT the preferred option according to the current status of the study, (v) will the government help fund a project of this calibre if LRT is chosen as the appropriate option; (l) has the number of lanes on the new bridge been established and, if not, (i) what will be the process determining that recommendation, (ii) who is responsible for making the final decision, (iii) are there any plans to include bicycle paths or pedestrian walkways; (m) has the government studied the possibility of a gradual replacement instead of the complete new bridge, such as the proposal brought forward by civil engineer René Therrien, as found at the URL http://solutionpontchamplain.com/la-solution/; (n) will the preliminary design and financial analysis include a team of architects to consider aesthetic aspects of the new structure, (i) what will be the process determining that recommendation, (ii) who is responsible for making the final decision, (iii) will there be an architecture competition; (o) will the name of the new bridge over the St. Lawrence remain the Champlain Bridge, (i) if not, has a name been chosen and by whom, (ii) if no name has been chosen, what will be the process in order to determine the name of the new bridge, (iii) has a timeline been specified to determine the name of the new bridge; (p) regarding the PricewaterhouseCooper-led consortium contract, (i) what type of financial services will it offer, (ii) what type of technical and engineering work will it provide, (iii) what is the total cost of the 18 month contract, (iv) will the PricewaterhouseCooper-led consortium continue to be part of the process, and will the government take into account its recommendations; (q) how will the recommendation for the procurement be accessed by the government and what type of recommendation does the procurement process and construction usually entail; (r) what are the differences between the eight new design options for the initial review, (i) will these be made public, (ii) at what time; and (s) what options are being considered by Transport Canada regarding the implementation of tolls, (i) has the government decided if the new structure will be a toll bridge, (ii) if not, when will the government make a decision on this, (iii) was the PricewaterhouseCooper-led consortium mandated to present the government with financial options that would include a toll bridge, (iv) if the government decides to include a toll on the bridge, what will the profit go towards and how will the price of the toll be decided, (v) will there be different categories of prices and, if so, how will these be determined?

Question No. 899Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Roberval—Lac-Saint-Jean Québec

Conservative

Denis Lebel ConservativeMinister of Transport

Mr. Speaker, on October 5, 2011, Minister Lebel announced that the Government of Canada will proceed with a new bridge for the St. Lawrence River in the Montreal region. The planning process for this major infrastructure project is well under way and will take several years to complete. The government has already initiated consultations with key stakeholders, which include the Government of Quebec, regional mayors and industry representatives. The government intends to continue consulting them regularly throughout the bridge planning process.

Based on the information currently available, the cost of this new bridge, with associated work on the entire corridor, including the reconstruction of a section of Highway 15, the replacement of the Nuns’ Island Bridge and a new alignment of the new bridge with Highway 10 on the South Shore, is estimated to be between $3 billion and $5 billion. This estimate is very preliminary and expected to be refined as work progresses and bridge designs are firmed up. All decisions will be taken in a fiscally responsible manner. In this regard, the creation of a public-private partnership to build and maintain the new bridge, as well as the use of tolls, will be examined.

Our government recognizes the importance of public transit for the residents of the greater Montreal area, who cross the bridge morning and evening. As such, the new bridge for the St. Lawrence will likely encompass a public transit component, and we will work closely with the Government of Quebec in that regard.

Question No. 900Questions on the Order PaperRoutine Proceedings

3:15 p.m.

NDP

Hoang Mai NDP Brossard—La Prairie, QC

With regard to the safety and security of the Champlain Bridge in Montreal: (a) what contingency plan does the government have in case a serious emergency or other factor requires a shut-down of the bridge; (b) were there safety concerns that prompted the Nuns’ Bridge announcement in July and, if so, were these concerns based on a report or study; and (c) at what time in the planning stages of the replacement of the Champlain Bridge was the elaboration of a temporary bridge included?

Question No. 900Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Roberval—Lac-Saint-Jean Québec

Conservative

Denis Lebel ConservativeMinister of Transport

Mr. Speaker, in response to (a), the Government of Canada has funded investments for the Champlain Bridge through special programs for the maintenance of the bridge to ensure its safety and to avoid closures.

Fiscal year 2012-2013 is the fourth year of delivery of the 10-year $212 million Champlain Bridge maintenance program. Works totalling $ 78.3 million to maintain the bridge in a safe operating condition have been expended to date since the beginning of the program. In addition to the $212 million program, funding of $227.6 million for urgent works and asset preservation for a three-year period was announced in March 2011. The Jacques Cartier and Champlain Bridges Inc., JCCBI, is completing year 2 of this program, which also includes funds for Highway 15 and Bonaventure Expressway. A total of $94.8 million of the aforementioned amount was budgeted for the Champlain Bridge and approaches. Works totalling $26.7 million to maintain the bridge in a safe operating condition have been expended to date.

In response to (b), the Nuns’ Island Bridge part of the Champlain Bridge corridor has been affected by deterioration similar to that of the Champlain Bridge. The structures are inspected on a regular basis. In December 2011, JCCBI retained the services of Delcan, a private sector engineering firm, to conduct a structural assessment of the Nuns’ Island Bridge. This report is available on JCCBI’s website. The announcement made in July 2012 to replace the existing bridge by a temporary causeway is the result of recommendations made by JCCBI following its receipt of the Delcan structural assessment.

In response to (c), in 2010, the BCDE Consortium retained by JCCBI and the Ministère des Transports du Québec, MTQ, to draft a prefeasibility report developed options, including a temporary bridge, as a preliminary phase for the definitive replacement of the existing Nuns’ Island Bridge.

Question No. 904Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Green

Elizabeth May Green Saanich—Gulf Islands, BC

With regard to the loan Canada provided to China (agreed upon on November 26, 1996, and authorized by Parliament though the Supplementary Estimates in Appropriation Act No. 4, 1995-96), through Export Development Canada's (EDC) Canada Account in the sum of $1.5 billion CAD, as part of the agreement to sell to China two Atomic Energy of Canada Limited CANDU-6 reactors for Phase III of the Qinshan project at Hangzhou Bay in Zeijiang Province, China: (a) for all monies loaned to China as part of this agreement, (i) what Canadian agency, department, or crown corporation was responsible, (ii) what was the total sum of the loan, (iii) what is the scheduled due date of the loan and on what date did the term commence, (iv) what is the current repayment status of the loan, (v) what portion of the loan has been repaid, (vi) what is the outstanding balance of the loan, (vii) what is the value of the interest to be accrued over the full term of the loan; (b) if any loan associated with this agreement has not been repaid by China in accordance with the original terms of the agreement, (i) what recourse demands have been made, (ii) what further actions has the government, or its departments, agencies, or crown corporations, taken to recover money lent, (iii) as a result of any non-payment by the debtor, what, if any, funds have been paid to EDC from the Consolidated Revenue Fund; (c) what studies, reviews, or audits have been conducted by the government of the loan guarantee associated with this agreement, including by (i) the Department of Foreign Affairs and International Trade, (ii) EDC, (iii) the Department of Finance; and (d) for each study, review, or audit, (i) what are its contents, (ii) on what date(s) was it conducted, (iii) what actions or decisions were taken by the government or its agencies or departments in response?

Question No. 904Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Abbotsford B.C.

Conservative

Ed Fast ConservativeMinister of International Trade and Minister for the Asia-Pacific Gateway

Mr. Speaker, in response to (a)(i), for all monies loaned to China as part of this agreement, Export Development Canada, EDC, entered into a loan agreement in an amount of $1.5 billion in accordance with the terms and conditions of a ministerial authorization implementing a decision of cabinet. In response to (a)(ii) the total sum of the loan was $1,497,354,054. In response to (a)(iii) the scheduled due date of the loan was July 20, 2018, and the commencing date was January 12, 1997. In response to (a)(iv) and (v), the loan has been fully repaid. In response to (a)(vi), there is no outstanding balance of the loan. In response to (a)(vii), the value of the interest accrued over the term of the loan was $414,169,012.51 in U.S. dollars.

Regarding (b), it is not applicable.

Regarding (c)(i) and (iii), they are not applicable. In response to (c)(ii), EDC did not conduct any special studies, reviews or audits aside from its standard due diligence practices.

Regarding (d), it is not applicable.

Question No. 916Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Liberal

Mark Eyking Liberal Sydney—Victoria, NS

With respect to the United Nations Arms Trade Treaty Conference held in July 2012: (a) what are the names, titles and affiliations of those who attended on behalf of Canada; and (b) what are the details of the documents produced for the Canadian delegation in advance of the Conference?

Question No. 916Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Ottawa West—Nepean Ontario

Conservative

John Baird ConservativeMinister of Foreign Affairs

Mr. Speaker, Canada supports efforts to establish international standards for arms transfers in order to help prevent illicit transfers that fuel conflict, encourage terrorism or organized crime. The government has been clear, however, that it is very important that any arms trade treaty, ATT, recognizes and acknowledges the legitimacy of lawful ownership of, and trade in, firearms by responsible citizens for their personal and recreational use, including sport shooting, hunting and collecting. While we are disappointed by the failure of the July 2012 conference, and of the obstructionist tactics employed by a small number of countries such as Iran, we are not discouraged. Canada will continue to work with others to develop an ATT that respects the legal trade in arms, including the legitimate trade or use of hunting and sporting firearms.

In response to (a), the Canadian delegation to the United Nations Arms Trade Treaty Conference was as follows: Habib Massoud, deputy director, conventional weapons and space issues, non-proliferation and disarmament division, Foreign Affairs and International Trade Canada, as head of the delegation; Paul Galveias, senior export control officer, export controls division, Foreign Affairs and International Trade Canada; Kim Joslin, senior policy officer, non-proliferation and disarmament division, Foreign Affairs and International Trade Canada; Roxane Milot, defence policy officer, directorate of strategic analysis, Department of National Defence; Major Kyle Solomon, defence advisor, strategic joint staff-plans, Department of National Defence; Lieutenant-Commander Gordon Thomson, defence legal advisor, directorate of international and operational law, Department of National Defence; Jeffrey Westgarth-Taylor, policy advisor, export controls division, Foreign Affairs and International Trade Canada; Saad Zia, legal officer, United Nations, human rights and economic law division, Foreign Affairs and International Trade Canada; and Stephen Torino, president, Canadian Shooting Sports Association.

In response to (b), the documents produced for the Canadian delegation in advance of the conference were as follows: a paper entitled “Canada's Focused Views on a Future Arms Trade Treaty”, http://www.un.org/ga/search/view_doc.asp?symbol=A/CONF.217/2&Lang=E, and a memorandum to cabinet, “Mandate to Negotiate an Arms Trade Treaty”, which is subject to cabinet confidence. This document was provided solely to Government of Canada employees with the appropriate security clearance.

Question No. 924Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Liberal

Lawrence MacAulay Liberal Cardigan, PE

With respect to the closure of the Canadian Embassy in Iran: (a) what are the details of the briefing documents produced for the Minister of Foreign Affairs and the Prime Minister in anticipation of the closure; and (b) who else received these documents?

Question No. 924Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Ottawa West—Nepean Ontario

Conservative

John Baird ConservativeMinister of Foreign Affairs

Mr. Speaker, on September 7, 2012, Canada closed its embassy in Iran and declared personae non gratae all remaining Iranian diplomats in Canada. At the same time, Canada designated the Iranian regime as a state sponsor of terrorism under the Justice for Victims of Terrorism Act, JVTA.

The above decisions were taken as the result of the Iranian regime’s own actions, and reflect Canada’s view that the Iranian regime is the most significant threat to global peace and security in the world today. The Iranian regime is providing increasing military assistance to the Assad regime; it refuses to comply with UN resolutions pertaining to its nuclear program; it routinely threatens the existence of Israel and engages in racist anti-Semitic rhetoric and incitement to genocide; it is among the world’s worst violators of human rights; and it shelters and materially supports terrorist groups. The Minister of Foreign Affairs is briefed regularly, by senior officials, on the threat posed by Iran to international peace and security.

The closure of the Embassy of Canada in Tehran was also the result of Iran’s blatant disregard for the Vienna Convention on Diplomatic Relations and its guarantee of protection for diplomatic personnel. Our diplomats serve Canada as civilians, and their safety is our number one priority. As such, the Minister of Foreign Affairs is briefed regularly, by senior officials, on the security of Canada’s missions abroad and any developments that require a review of security measures or risk assessments with regard to a specific mission.

The specific details of materials prepared for the government concerning policy options developed in response to the Iranian threat, together with ongoing risk assessments for individual missions, are protected.

Question No. 928Questions on the Order PaperRoutine Proceedings

3:15 p.m.

NDP

Robert Chisholm NDP Dartmouth—Cole Harbour, NS

With regard to research conducted at the Experimental Lakes Area (ELA): (a) why were Department of Fisheries and Oceans scientists recently awarded competitive internal grants on departmental priorities for conducting research at ELA; (b) was any analysis done on the impact on existing programs of cancelling funding on March 31, 2012, for the ELA and, if not, why not; (c) will the government conduct an analysis before cancelling the funding; and (d) what contingency plans are being made for research or projects that will not have been completed by the deadline?

Question No. 928Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Egmont P.E.I.

Conservative

Gail Shea ConservativeMinister of National Revenue

Mr. Speaker, in response to (a), the termination of Fisheries and Oceans Canada’s role in the operations at the Experimental Lakes Area is part of the budget 2012, announced on March 29, 2012. While budget 2012 was in development, the department was undergoing its normally established planning process for scientific research, including requesting research proposals from departmental scientists.

In response to (b) and (c), after conducting a full review of its operations leading into budget 2012, Fisheries and Oceans Canada is increasingly focusing its resources on priority areas that directly support conservation and fisheries management. The department is now focusing on work being conducted at other freshwater research facilities across the country, which will more than adequately meet the departmental research needs.

In response to (d), managers are working with researchers on transition plans for projects at the facility. While the department is winding down operations at the Experimental Lakes Area, it is continuing to conduct freshwater research in various other locations across Canada. The department hopes to transfer the Experimental Lakes Area so that the research can continue to be conducted by another party that will benefit from it.

Question No. 929Questions on the Order PaperRoutine Proceedings

3:15 p.m.

NDP

Robert Chisholm NDP Dartmouth—Cole Harbour, NS

With regard to decommissioning or transferring operations of the Experimental Lakes Area (ELA) site: (a) has an economic analysis been done on the cost of remediation of the site upon decommissioning to meet the criteria agreed to in the Canada-Ontario Memorandum of Agreement for the ELA and, if not, why not; (b) what is the projected cost for remediation of the site; (c) what legal advice has the government sought regarding its liability for the site at decommissioning; (d) what legal advice has the government sought regarding its liability if it transfers the operation of the site to a third party; and (e) what discussions has the government had with the Province of Ontario on the options regarding decommissioning or transferring the operation to another operator?

Question No. 929Questions on the Order PaperRoutine Proceedings

3:15 p.m.

Egmont P.E.I.

Conservative

Gail Shea ConservativeMinister of National Revenue

Mr. Speaker, in response to (a), (b) and (e), discussions are ongoing with the Province of Ontario, which owns the land, about the Canada-Ontario memorandum of agreement and future plans for the Experimental Lakes Area. Fisheries and Oceans Canada strongly favours transferring operations of the facility to an organization that is better positioned to conduct studies based on fundamental ecosystem manipulation. Fisheries and Oceans Canada is currently gathering information and conducting studies to support either transferring the facility to another operator or decommissioning the site. Officials from Fisheries and Oceans Canada have had several productive discussions with representatives of the Province of Ontario regarding future plans for the facility

In response to (c) and (d), Fisheries and Oceans Canada has sought legal advice as appropriate.

Question No. 933Questions on the Order PaperRoutine Proceedings

3:15 p.m.

NDP

Dany Morin NDP Chicoutimi—Le Fjord, QC

With regard to the First Nations and Inuit Health Branch (FNIHB): (a) does the 2012 Economic Action Plan (Budget 2012) include decreases in FNIHB’s financial resources; (b) what amount in FNIHB’s budget envelope is earmarked for on-reserve direct services; (c) what amount in FNIHB’s budget envelope is earmarked for purposes other than on-reserve direct services; (d) for what purposes are the amounts in (c) earmarked; and (e) is there a study or are there reports regarding the impacts on urban Aboriginal women of policy shifts toward on-reserve direct services in Budget 2012, and, if so, which ones?