With regard to the Wolseley Barracks: (a) what was the reason for the 2013 demolition of the three buildings at the Barracks; (b) why has said work been called to a halt; (c) how much is the demolition predicted to cost; (d) how much money was spent on repairs to the three buildings between 2008 and 2013; (e) how much is the demolition supposed to save in the long run; and (f) how will those receiving training at Wolseley Barracks be housed once all the designated buildings are gone?
In the House of Commons on March 7th, 2014. See this statement in context.