Mr. Speaker, would the member opposite be able to tell us, with these estimates, whether or not we are going to see any actual deliveries materialize from them? Will we see any ships? The last ship that was delivered was the Asterix, something that we started, despite their efforts to crash that project.
Are we going to see any planes delivered? We delivered the C-17s and C-130s. All the Liberals have done is play political football with the fighter jet replacement, looking in the garbage pail in Australia for something to pull out for this made-in-Canada, made-in-cabinet capability gap with our fighter jets.
The Minister of National Defence was not the architect of Operation Medusa, but he was the architect of the capability gap with the fighter jets.