Mr. Speaker, in response to part (a), Canadian Forces personnel were involved in the rescue operation for HMCS Chicoutimi immediately after the fire was reported on October 5, 2004. After Chicoutimi ’s executive officer reported the incident, Maritime Forces Atlantic informed the Joint Rescue Coordination Centre in Halifax, as well as Royal Navy headquarters in Northwood, U.K. In turn, the Joint Rescue Coordination Centre informed the Maritime Rescue Coordination Centre in Clyde, U.K. After these initial actions, Canadian Forces personnel and departmental employees worked together in coordination with our allies to assist Chicoutimi ’s safe return to Scotland.
The chief of the maritime staff led this response that involved personnel from units across the country. Although the vast majority of personnel who deployed in support of this operation were from the navy, dedicated teams of staff were formed in both Halifax and Ottawa to help coordinate the response. In addition, the air force provided airlift resources to deploy personnel to the U.K. and Ireland.
As Chicoutimi belongs to the Atlantic fleet, the focus of the navy’s response was coordinated by Maritime Forces Atlantic. Within 24 hours of the incident, technical staff were travelling to the scene of the incident to join HMS Montrose , the U.K. ship responsible for coordinating all the assets in the area that provided assistance to Chicoutimi . These technical experts were supported by additional technical personnel in the U.K., Ottawa, Esquimalt, Halifax and elsewhere. Within 48 hours, a second group departed Halifax and was followed by additional support personnel. For example, a command qualified submariner was embarked in HMS Montrose and a repair damage assessment team was sent to Scotland to estimate the nature of the repairs that Chicoutimi would require. Support personnel established a forward logistics site. HMCS St. John’s was also deployed to the scene to provide support to Chicoutimi . In addition to personnel on HMCS St. John’s , approximately 65 Canadian Forces personnel were in place to assist Chicoutimi when it arrived alongside in Faslane. Throughout this time period, the Canadian defence liaison staff, London, and our embassy in Ireland provided additional support.
In response to part (b), prior to departing for Halifax, Chicoutimi underwent pre-sea trial tests, harbour trials and at sea trials. In preparation for Chicoutimi ’s at sea trial, a series of pre-sea trial technical tests on engineering systems were performed. These tests included the submarine’s navigation, communication, propulsion, and weapons systems. As well, the submarine’s habitability, stores and firefighting equipment were inspected during this pre-sea trial phase.
Before the submarine was accepted into Canada’s fleet, Chicoutimi undertook a series of separate harbour and at sea confidence checks and trials which were performed in a graduated fashion. As part of the harbour trials, the safe to dive certification, escape inspection, and final defect rectification were carried out. At sea trials themselves covered the full range of technical, procedural, and ship performance tests. Representatives of the Canadian Forces submarine project were involved in all of these tests and trials.