Refine by MP, party, committee, province, or result type.
Natural Resources committee Okay. It's not much longer. At level five, we have rig-specific work methods. This level includes procedures specific to the rig vessel--short, detailed instructions. I'll go quickly through the main safety tools: risk assessment; “toolbox talks”; lifting plans; a safe behavio
May 25th, 2010Committee meeting
Stuart Greer
Natural Resources committee Okay. The Stena Carron is number two in a series of three Drillmax series vessels. These are state-of-the-art, sixth-generation, ultra-deepwater, dynamically positioned drillships designed and certified for year-round worldwide operations in ultra-deepwater. The latest-generat
May 25th, 2010Committee meeting
Stuart Greer
Natural Resources committee I'd like to apologize for that.
May 25th, 2010Committee meeting
Stuart Greer
Natural Resources committee Yes. The vessel has an approximately 15,000-metric-tonne variable deck load and a maximum transit speed of 12 knots. The classification class by DNV is a 1A1 ship-shaped drilling unit, drill “N” classification, which means all the drilling equipment actually comes under the cla
May 25th, 2010Committee meeting
Stuart Greer
Natural Resources committee We're going to make a presentation. I'm able to put it up on your screen, actually, so you can see some of the graphics. Mr. Chairman and members of the committee, I'd like to make a brief presentation on the Stena Carron and Stena Drilling safety management system. I'd like to
May 25th, 2010Committee meeting
Stuart Greer
Natural Resources committee This gentleman is Mr. John Banks, the chief operations officer of Stena Drilling.
May 25th, 2010Committee meeting
Stuart Greer