Part 1 implements certain measures in relation to project evaluations.
Division 1 of Part 1 amends the Impact Assessment Act to, among other things,
(a) provide that the Canadian Nuclear Safety Commission is to conduct the impact assessment of a designated project that includes activities that are regulated under the Nuclear Safety and Control Act ;
(b) authorize the Minister of the Environment to grant certain federal authorizations that are required in respect of a designated project at the same time that the Minister issues a decision statement in respect of the project;
(c) ensure that a decision statement in respect of a designated project for which the Impact Assessment Agency of Canada conducts the impact assessment is issued within one year after the proponent provides the required information or studies;
(d) provide for the coordination of the impact assessment of designated projects and the review processes for certain federal authorizations that are required in respect of those projects; and
(e) provide for the coordination of consultations with Indigenous groups.
Division 2 of Part 1 amends the Building Canada Act to, among other things,
(a) establish, for certain types of projects located within a region of national interest, a similar framework to the one applicable to national interest projects;
(b) allow the minister designated under that Act to add, remove or amend any condition in respect of an authorization that was granted for a national interest project before the name of that project was added to Schedule 1 to that Act;
(c) ensure that obligations to make information public associated with decisions made under that Act are administratively feasible; and
(d) authorize the Governor in Council to add the name of a region to a new schedule to that Act if the Governor in Council is of the opinion, having regard to certain factors, that the designation of that region is in the national interest.
Division 3 of Part 1 amends the Canadian Energy Regulator Act to, among other things,
(a) ensure decisions in respect of pipelines, designated power lines and offshore renewable energy projects are issued within one year of receiving the required information and studies;
(b) provide for the coordination of consultations with Indigenous peoples of Canada in respect of pipelines, designated power lines and offshore renewable energy projects;
(c) provide for the coordination of federal authorizations in respect of pipelines, designated power lines and offshore renewable energy projects with federal authorities;
(d) provide that the Commission is the sole assessor of applications in respect of pipelines, designated power lines and offshore renewable energy projects;
(e) provide authority for the Commission to
(i) make decisions in respect of applications relating to pipelines, designated power lines and offshore renewable energy projects, unless otherwise specified in the Act,
(ii) exempt certain pipelines or branches of or extensions to pipelines from the application of certain provisions, and
(iii) integrate a detailed route hearing into an ongoing hearing; and
(f) provide that the Governor in Council is to determine whether certain pipelines and designated power lines are in the public interest.
It also makes consequential amendments to the Federal Courts Act and the Northern Pipeline Act .
Division 4 of Part 1 amends the Canadian Navigable Waters Act to require the Minister of Transport to, among other things, take into account the feasibility of the terms and conditions in respect of an approval relating to certain works. It also transfers to that Minister the power to exempt bodies of water from the application of certain provisions of the Act if that Minister is satisfied that it would be in the public interest. Finally, it allows the Governor in Council to make regulations to exclude structures, devices or other things from the definition “work” to avoid duplication with other Acts and regulations.
Division 5 of Part 1 amends the Canadian Environmental Protection Act, 1999 to, among other things,
(a) ensure that environmental protection compliance orders may be issued with respect to any thing to which that Act applies and to non-continuing offences, including with respect to contravening imports;
(b) broaden the scope of such orders by permitting an enforcement officer to direct a person to take additional measures, such as managing contravening imports in the manner specified in the order, returning them to their place of origin or removing them from Canada; and
(c) provide that certain permits issued under that Act may, in certain circumstances, be valid for more than one year.
Division 6 of Part 1 amends the Species at Risk Act to, among other things, require the competent minister to take into account the feasibility of the terms and conditions in respect of certain agreements and permits.
Division 7 of Part 1 amends the Fisheries Act to, among other things,
(a) modify the fish habitat bank regime to allow for the use of habitat credits by third parties;
(b) authorize the making of regulations respecting the circumstances in which a person who is authorized to carry on a work, undertaking or activity may pay a fee to offset adverse effects on fish and fish habitat and provide for these fees to be credited to the Environmental Damages Fund; and
(c) transfer certain regulation-making powers from the Governor in Council to the Minister of Fisheries and Oceans.
Part 2 implements certain measures in relation to supply chains.
Division 1 of Part 2 amends the Department of Transport Act to provide the Minister of Transport with the power to establish a transportation project office that coordinates review processes for federal authorizations and consultations with respect to transportation projects.
Division 2 of Part 2 amends the Canada Transportation Act to, among other things,
(a) provide that the Minister of Transport may designate geographic areas as trade corridors and establish the National Trade Corridors Council, whose mandate is to monitor the movement of goods in trade corridors, analyze disruptions that may affect trade corridors and make recommendations and provide advice to that Minister;
(b) provide that Minister with the authority to make regulations to give effect to international standards or ensure compliance with Canada’s international obligations;
(c) expand the purposes for which that Minister may request that federal departments and agencies provide information that has already been provided by regulated entities to those federal departments and agencies;
(d) clarify the application of the requirement to notify that Minister of proposed transactions involving transportation undertakings;
(e) reduce the threshold for the requirement to notify that Minister and the Commissioner of Competition of proposed transactions involving transportation undertakings situated in a “port”, as defined in section 5 of the Canada Marine Act ;
(f) provide that that Minister may, for any purpose related to transportation security or safety, to the integrity of the national transportation system or to public safety or for any purpose specified by order, grant, suspend or cancel security clearances;
(g) authorize, for the purposes of administering and enforcing the security clearances regime, certain individuals or entities to collect information from and disclose information to each other;
(h) authorize the Governor in Council to make regulations respecting security clearances;
(i) expand the exceptions to the requirement to obtain the Canadian Transportation Agency’s approval for the construction of railway lines; and
(j) establish, for a period of four years, a zone in Manitoba, Saskatchewan and Alberta in which any interswitching that occurs is subject to the rate determined by the Canadian Transportation Agency.
Division 3 of Part 2 amends the Canada Marine Act to, among other things,
(a) authorize the Governor in Council to allow a port authority to enter into joint-liability arrangements and to create entities other than wholly-owned subsidiaries to undertake activities within or outside the limits of the port;
(b) authorize the Minister of Transport to appoint certain directors of a port authority;
(c) add principles that a port authority must observe when fixing port fees and expand the grounds on which a fee-related complaint may be filed with the Canadian Transportation Agency;
(d) authorize the Governor in Council to appoint, in certain circumstances, an administrator for a not-for-profit corporation that has entered into an agreement in respect of the St. Lawrence Seaway;
(e) authorize that Minister to terminate such an agreement or any part of one and provide for a dispute resolution process to deal with any disputes arising from the termination; and
(f) authorize that Minister to require that any of the following persons take measures to prevent or mitigate certain threats or stop any activity that would contribute to such threats:
(i) a port authority,
(ii) a person in charge of a port facility,
(iii) a person responsible for the management and operation of all or part of the St. Lawrence Seaway or for any works, undertakings or property used in the operation of the Seaway,
(iv) an occupier or person in charge of any federal real property, or any federal immovable, that is subject to being administered under Part 3 of that Act.
It also makes consequential amendments to the Port Authorities Operations Regulations .
Division 4 of Part 2 amends the Marine Liability Act to, among other things,
(a) modify the definition “receiver” to refer to the person who physically receives bulk hazardous and noxious substances carried by sea as cargo and discharged at a port or terminal in Canada; and
(b) harmonize the inspection and enforcement provisions relating to that person.
It also makes related amendments to the Safeguarding Canada’s Seas and Skies Act .
Division 5 of Part 2 amends the Coasting Trade Act to allow foreign ships or non-duty paid ships to engage, without a licence, in activities in response to a declared emergency.
Division 6 of Part 2 repeals the Shipping Conferences Exemption Act, 1987 and makes a consequential amendment to the Access to Information Act .
Division 7 of Part 2 amends the International Bridges and Tunnels Act to allow the Minister of Transport to make certain decisions that were previously made exclusively by the Governor in Council.
Division 8 of Part 2 enacts the Enabling Digital Trade Act which, among other things,
(a) sets out the rules for the use of electronic trade documents as the functional equivalents to paper trade documents that are related to trade in goods;
(b) eliminates the requirement to provide information to the Government of Canada in physical form in relation to the importation or exportation of goods; and
(c) permits a federal minister, or an officer or employee of a department or agency of the Government of Canada, to disclose information that is related to the importation or exportation of goods if the receiving minister, department or agency of the government is permitted by law to collect that information.
Part 3 implements certain measures related to the work force.
Division 1 of Part 3 amends the Canada Labour Code to, among other things,
(a) establish new requirements and timelines related to collective bargaining;
(b) provide for the transfer of certain rights in the context of certain contractors being replaced by new contractors;
(c) establish new requirements and authorities in relation to entering into first collective agreements;
(d) provide that the Canada Industrial Relations Board may certify a trade union as the bargaining agent for existing bargaining units in certain industries in certain geographic areas on application of two or more employers, on referral of the Minister of Labour or on that Board’s initiative;
(e) confer on the Minister of Labour the power to appoint a special mediator to assist parties in settling a dispute that arises in connection with the entering into, renewal or revision of a collective agreement; and
(f) establish new requirements for that Minister to direct the Canada Industrial Relations Board to take measures under section 107 of that Act.
It also makes consequential amendments to certain regulations.
Division 2 of Part 3 amends the Canada Labour Code to, among other things,
(a) authorize the Head of Compliance and Enforcement to issue a settlement enforcement order requiring an employer or director of a corporation to pay any outstanding amounts that are to be paid under a settlement with an employee; and
(b) permit an order to debtor to be issued, in certain circumstances, before a settlement enforcement order or payment order has been issued.
Division 3 of Part 3 provides that Division XIII of Part III of the Canada Labour Code does not apply to an employer and employees who are parties to a collective agreement that confers rights and benefits at least as favourable as those conferred by that Division XIII with respect to medical leave of absence with pay.
Division 4 of Part 3 amends the Wage Earner Protection Program Act to, among other things, define the term “former employer” for the purposes of that Act and to specify that the Minister may confirm, vary or rescind a determination of eligibility even without a request for review.

Elsewhere

All sorts of information on this bill is available at LEGISinfo, an excellent resource from Parliament. You can also read the full text of the bill.

Bill numbers are reused for different bills each new session. Perhaps you were looking for one of these other C-39s:

C-39 (2023) Law An Act to amend An Act to amend the Criminal Code (medical assistance in dying)
C-39 (2017) An Act to amend the Criminal Code (unconstitutional provisions) and to make consequential amendments to other Acts
C-39 (2014) Law Appropriation Act No.3 , 2014-15
C-39 (2012) Law Restoring Rail Service Act

Votes

Oct. 8, 2026 Passed 2nd reading of Bill C-39, An Act respecting certain measures to strengthen the economy

Debate Summary

line drawing of robot

This is a computer-generated summary of the speeches below. Usually it’s accurate, but every now and then it’ll contain inaccuracies or total fabrications.

Bill C-39 proposes coordinated federal reviews with targeted timelines for major projects, changes to transportation corridors, ports, trade digitization and security, and amendments to federal labour rules concerning bargaining, dispute resolution and worker protections.

Liberal

  • Supports faster project approvals: Supports a coordinated “one project, one review, one year” process to attract investment and build infrastructure faster, while maintaining environmental standards and Indigenous rights and consultation.
  • Modernizes trade corridors: Would designate national trade corridors, improve port governance and coordination, and digitize trade processes to reduce bottlenecks, strengthen supply chains and diversify exports beyond the United States.
  • Protects workers and bargaining: Supports earlier bargaining, mediation and stronger workplace protections to improve labour stability, while affirming workers’ right to strike and adding guardrails to exceptional government intervention.

Conservative

  • Supports building projects: Conservatives support faster construction, investment and jobs, but will judge Bill C-39 by measurable results rather than announcements, and say the previous Bill C-5 has delivered little.
  • Questions timeline guarantees: They argue the one-year approval promise is not binding: preparation occurs before the clock starts, and officials or cabinet can pause or extend it, leaving investors without certainty.
  • Wants deeper deregulation: Conservatives call for repealing Bills C-69 and C-48 and the industrial carbon tax, with one project, one review and firm approval deadlines instead of more bureaucratic workarounds.
  • Demands scrutiny of labour changes: Members warn that changes to section 107 could weaken collective bargaining and workers’ right to strike, and demand thorough committee study, consultation and safeguards before decisions are made.

NDP

  • Opposes bill C-39: The NDP argues the bill concentrates power in ministers, weakens workers’ rights, risks environmental safeguards and Indigenous rights, and transfers decision-making away from communities and independent experts.
  • Protects the right to strike: The party opposes codifying and expanding ministerial powers to end legal strikes, saying this undermines constitutionally protected rights, weakens workers’ bargaining leverage and discourages employers from negotiating fairly.
  • Safeguards environment and Indigenous rights: The NDP warns that fixed approval deadlines, weakened project conditions and accelerated consultation could harm ecosystems and compress Indigenous rights; it says meaningful consultation and environmental review are essential to responsible development.
  • Builds fairly and together: The party supports building housing, clean energy and infrastructure, but says nation-building must create good union jobs, respect Indigenous rights, protect the environment and include communities rather than prioritize speed and corporate rewards.

Bloc

  • Opposes Bill C-39: The Bloc will vote against Bill C-39, arguing that it uses the trade crisis to justify permanent changes that weaken environmental protections, workers’ rights and democratic accountability.
  • Environmental safeguards: The Bloc warns that rushed assessments, project pre-approval and shifting reviews to energy regulators undermine scientific independence, public consultation and the ability to prevent environmental harm.
  • Right to strike: The Bloc says the bill gives ministers broad discretion to end lawful strikes based on undefined national-interest criteria, weakening collective bargaining and shifting power toward employers.
  • Executive power and Quebec: The Bloc objects to concentrating authority in ministers and the Prime Minister, circumventing Parliament and laws, and intruding on Quebec and provincial roles in managing natural resources.

Green

  • Opposes rushed project approvals: The Green Party warns that Bill C-39 could direct billions in public money to projects without basic cost-benefit analysis, risking economic waste and serious environmental and Indigenous-rights harms.
  • Demands evidence and transparency: The party rejects the premise that speed is inherently beneficial, arguing that weak planning, political pressure and cabinet discretion without transparent evidence make major projects more likely to fail.
  • Protects environmental conditions: The Greens oppose amendments that make project approval conditions subject to tests of economic feasibility or practicality, warning proponents could challenge binding safeguards and weaken environmental laws.
  • Defends collective bargaining: The party supports the Canadian Labour Congress’s concerns about part 3’s threat to collective bargaining and the trade union movement, and calls for substantial amendments.
Was this summary helpful and accurate?

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 6:40 p.m.

Conservative

Ellis Ross Conservative Skeena—Bulkley Valley, BC

Mr. Speaker, that was a very comprehensive speech. It actually related to everything I have learned over the last 20 years.

I will not say “rights and title” but “indigenous interests”. In relation to indigenous interests, the Prime Minister said the content of UNDRIP would not be affected by a pipeline going to the Pacific coast. However, with the original Trans Mountain pipeline, there were first nations that did not give their consent to the pipeline, yet the project was still approved.

Are we expecting something similar with the Pacific link pipeline as proposed?

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 6:40 p.m.

Liberal

Patrick Weiler Liberal West Vancouver—Sunshine Coast—Sea to Sky Country, BC

Mr. Speaker, what we saw with the Trans Mountain pipeline was the original approval of the pipeline being challenged in court and overturned for the consultations' not meeting the standard of section 35. What this means in practice is that where a project is going to impact a proven or claimed aboriginal right, there needs to be consultation or accommodation based on the level of impact. That is what the law states and that is what would be appropriate for any other project.

It is very important. Some of the changes made here would facilitate consultation, happening both before a project site is chosen and throughout the process, through the new Crown consultation hub. This is critically important. It is not something we can legislate away. This is a constitutional obligation that we have toward first nations. The processes that have been proposed today would very much help produce a better process for that.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 6:40 p.m.

Liberal

Arielle Kayabaga Liberal London West, ON

Mr. Speaker, my colleague talked about the importance of building projects faster. Maybe he could expand a bit on the one-year review timeline that the government intends to implement in Bill C-39. What would that mean for the communities and businesses that are waiting for the implementation and would be able to have these investments in their communities?

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 6:45 p.m.

Liberal

Patrick Weiler Liberal West Vancouver—Sunshine Coast—Sea to Sky Country, BC

Mr. Speaker, this one-year review timeline is critically important. We know we need to build fast and we need to build at scale.

I want to give an example of a project in my riding that faced some significant delays. There is a big housing development where just the process of getting the habitat compensation project approved ended up taking three years. This is holding up getting thousands of new homes built. Rather than having to go through a multi-year process for habitat restoration work, this would allow for the purchasing of credits in a bigger habitat compensation project that could make a much bigger difference. This is instead of having to wait years for each individual project.

This is one of the many efficiencies that would be created by this legislation that are both good for the environment and good for getting meaningful projects built in all of our communities.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 6:45 p.m.

Conservative

Kelly McCauley Conservative Edmonton West, AB

Mr. Speaker, the member opposite was very vocal not too long ago about imposing an oil and gas cap on Canada. I wonder if he still supports that and if he supports the planned pipeline through B.C. to the B.C. coast.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 6:45 p.m.

Liberal

Patrick Weiler Liberal West Vancouver—Sunshine Coast—Sea to Sky Country, BC

Mr. Speaker, this government has made a commitment to make Canada a clean and conventional energy superpower. That means doing what we can to grow our economy right now, and it makes sure that we are diversifying our export markets.

This bill would allow us to be more competitive in a global market and get our products to market. It would allow us to be competitive in terms of seeking investment and creating those opportunities right across the country. Those opportunities are there in every sector of our economy.

Canada has what the world wants. We have amazing opportunities. Particularly in my province of British Columbia, we are the gateway to Asia. This is where a lot of this development is going to happen, and the measures that are in this bill would allow us to fully take advantage of that.

The House resumed consideration of the motion that Bill C-39, An Act respecting certain measures to strengthen the economy, be read the second time and referred to a committee, and of the motion that this question be now put.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 6:50 p.m.

Conservative

Kelly McCauley Conservative Edmonton West, AB

Mr. Speaker, I am very pleased to rise on Bill C-39, another cynical Liberal bill. Do members remember years back when the Liberal government campaigned to end all government practice of using omnibus bills to reduce scrutiny of legislative measures? This was part of their campaign for a “real change” plan for restoring democracy. What do we have here? We have another massive omnibus bill, one of many introduced by a Liberal government that promised to do away with omnibus bills. It is the same Liberal government that promised to increase transparency, and it has done the opposite. It is the same Liberal government that said there would be more accountability for its legislation, yet we have the opposite.

We have the same Liberal government creating side departments to circumvent Parliament and accountability, such as the Defence Investment Agency, which is called the DIA. It is actually more like the DOA because it is still being debated. It was created as part of the budget implementation act, but before it has even been officially created, the Liberals are already killing it off and trying to turn it into a Crown corporation, which would allow even less scrutiny and accountability. However, I digress.

As I mentioned, here we go again with another omnibus bill from the Liberals. I am sure when they were putting this bill together, the Liberal PMO and other advisers were chortling about what a great wedge bill this is, because while it has legislation in it to increase economic growth, at the same time, there is a bit of a poison pill around labour so that if the Conservatives oppose the bill, they can say the Conservatives are opposing growth. If we support the bill, they will turn around and say the Conservatives are stabbing labour in the back. It is the same thing they are doing to my NDP colleagues. If the NDP does not support it, we know full well it is going to be a Liberal talking point to say the NDP is antidevelopment. If the NDP does support it, we know full well they will be saying the NDP supported all of their back-to-work legislation. It is a cynical wedge bill that could only be put forward by the government. It is unfortunate, but here we have it.

Why, I have to ask, another piece of legislation? Over a year ago in this House, the Conservatives supported the Liberals in passing Bill C-5 and gave unprecedented powers to the government to push through projects at speeds we have never seen before, of course. What happened? Nothing. Nothing has been done or approved, except that the Major Projects Office and the DIA were created, but they have not moved at the speed of anything.

The finance minister, when Bill C-5 was introduced, stated it was aimed at “accelerating transformative projects of national interest”. Where have we heard that? We have heard a lot lately about needing Bill C-39 to push through items of national interest. The Minister of Energy and Natural Resources said that Bill C-5 would remove barriers, leverage resources and help Canada become an energy superpower. That was for Bill C-5, so why is it repeated for Bill C-39?

In this House, we gave the Liberals unprecedented powers to get projects built, to build the economy, to perhaps get a pipeline built, to develop the energy industry and to develop the mining industry, and nothing was done. They brought in the Major Projects Office to sidestep their own regulations. The question I have is, why does the government not just fix its broken regulatory regime? Why do we have all these bills and regulations on the books? Why do the Liberals have to create legislation such as Bill C-5 to get around their own bad laws and regulations, Bill C-39 to do the same thing and the Major Projects Office to do the same thing? With defence procurement, there is the DIA, which they are now killing off to create a Crown corporation. Why do we need cabinet or bureaucrats deciding what is deemed worthy of special treatment?

That is what this is. It is the government picking winners and losers. It is no different from what the Liberals did a couple of years ago with piling taxpayers' money into EV battery projects around the country for billions and billions of dollars.

We saw it with Brampton. The Liberals gave Stellantis hundreds of millions of dollars. When we tried to investigate the money given to it, the deputy minister said that it was Stellantis that was refusing to release the documents about what happened with the money for Brampton. Stellantis came forward and said that this was not true, gave the documents and said the deputy minister was lying.

Again, it goes back to the question of why the government is picking winners and losers. Why not clear up the regulatory regime, the 300,000 some-odd regulations that are on the books, so that private capital can decide what is a winner and what is a loser? How is it that we have a pipeline to the Lower Mainland, for which taxpayers are going to pay the bill of probably $50 billion, and $10 billion, give or take, to dredge up Roberts Bank, with more public money probably going into bailing out carbon capture? How is that in the public interest, with all the public money going into it, when we could just change our rules and allow the private sector to get that work done, as with northern gateway, originally proposed to a deepwater port, which did not need taxpayers' money to dredge out? We did not need taxpayers' money to build the pipeline.

I support pipelines. We certainly need them. We saw today the gap between West Texas Intermediate and WCS, which is $25 a barrel because of the constrictions of exports caused by the government killing off northern gateway and killing off energy east. How is it in the public interest to spend billions and billions to do the pipeline when private capital could be doing it? Why not create a regulatory environment that is welcoming to capital and investment?

The International Energy Agency calls the current energy crisis “the largest supply disruption in history”. Canada has the fourth-largest oil reserves. We are the only one in the top four that is a democracy, the only one that follows the rule of law. We would think people would be begging to develop our oil and gas and begging to get pipelines built to get oil. Instead, because of the Liberals and the regulatory regime, we have to have public money doing it. Why is the government doing this instead of just getting out of the way?

According to a recent study, Canada has fallen from ninth to 18th on economic freedom. The factors in deciding this ranking include sound money, size of government and regulations. Under “Size of Government”, a thing that reads into our drop from ninth to 18th on freedom, is “Government consumption without interest payments”, which is very high under the government. “Government consumption with interest payments” is, again, very high. As for “Top marginal income tax rate and the threshold at which it applies”, the first thing the government did upon getting elected in 2015 was jack up the top marginal tax rate, followed by Premier Eby, it seems, right now.

On “State ownership of assets”, having too much state ownership of assets causes us to drop lower in the ranking. What are we seeing? The government is going to be owning Pacific link on top of TransCanada because the Liberals have created a regulatory environment where no one is investing in Canada.

Under “Sound Money” is “Money growth”. We saw the government printing hundreds of billions of dollars, with inflation. Under “Regulation” is “Regulatory burden”, which adds to our low ranking. There is “Bureaucracy costs” and “Impartial public administration”. It goes on and on.

The government needs to get out of the way of private capital. It needs to get out of the way of business. It needs to reduce the regulatory burden. It needs to stop coming forward with all this legislation that is supposed to do so much but does nothing. The government just needs to get out of the way.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 7 p.m.

Eglinton—Lawrence Ontario

Liberal

Vince Gasparro LiberalParliamentary Secretary to the Secretary of State (Combatting Crime)

Mr. Speaker, the hon. member knows that I have a great deal of respect for him. I listened intently to his comments. He spent a great deal of time talking about process. I have to be clear. Canada's government views this very clearly. Process is not the objective. Results and getting things done are the objective.

Does the hon. member not agree that having a one-year time frame to approve major projects through a clear and predictable system that benefits the private sector and benefits labour, while respecting indigenous rights and the environment, is a good thing?

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 7:05 p.m.

Conservative

Kelly McCauley Conservative Edmonton West, AB

Mr. Speaker, I quite enjoy working with my hon. colleague on the operations committee. I think we have a mutual respect for each other.

The legislation clearly proposes a one-year approval period, but it would not be one year as, perhaps, the government is pretending or creating propaganda about. It would be one year after the approval process gets through, and the minister could still step in and extend that one-year period. It is kind of a fake one year that the government is pushing out.

Before the member spoke, we were debating with the member for West Vancouver—Sunshine Coast—Sea to Sky Country, who was pushing for an oil and gas cap and could not even answer the question of whether he supported the very pipeline the government wants to build at taxpayers' expense. This is the issue. There is the paperwork, but members of his own government are opposing the oil and gas that Bill C-39 is supposed to be helping.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 7:05 p.m.

Conservative

Tamara Kronis Conservative Nanaimo—Ladysmith, BC

Mr. Speaker, in the previous question, the member opposite lamented the fact that process holds up these bills. I wonder if my colleague, whose speech was excellent, could speak about the importance of process in making sure Canadians are able to comprehend what their government is doing so that they can have confidence that it is working for them.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 7:05 p.m.

Conservative

Kelly McCauley Conservative Edmonton West, AB

Mr. Speaker, I do not have a lot of faith in this process the government is creating. There would be too much power in the hands of the minister and too much power with the bureaucrats.

Part of the bill, and I wish I had more time to get to it, is changes to the Labour Code, wherein an adjudicator appointed by the government would decide or help to decide whether to end a labour issue, not the House, as has been done traditionally. We would perhaps have a conflicted facilitator advising the government, and the minister alone deciding whether to order a stoppage. There would be no accountability to the House or to Canadians.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 7:05 p.m.

Liberal

Arielle Kayabaga Liberal London West, ON

Mr. Speaker, I heard my hon. colleague talk about this. I think it is easy to say government needs to get out of the way, or we need less government, without really putting into words what that actually means to real people.

The bill is a proposal to put in a one-year review timeline. What would the member propose to make things move forward so these investments can actually make it to the communities and the businesses who need them, other than just slogans or getting government out of the way?

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 7:05 p.m.

Conservative

Kelly McCauley Conservative Edmonton West, AB

Mr. Speaker, there is a very simple solution: get rid of Bill C-69, the “no new pipelines” bill, and get rid of Bill C-48, which bans Alberta oil off the northern B.C. coast. These two pieces of government legislation are responsible for the killing of more investment in this country than anything else Trudeau or anyone else in the government could have thought of.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 7:05 p.m.

Liberal

Bienvenu-Olivier Ntumba Liberal Mont-Saint-Bruno—L’Acadie, QC

Mr. Speaker, over the past few years, Canadians have seen how events that are happening far from home can have a very real effect on our economy. A conflict on the other side of the world can disrupt the energy market. A lack of shipping capacity can drive up costs for our businesses. A disruption on a railway, on a highway or at a port can affect producers and consumers at both ends of the supply chain.

In light of these circumstances, our government was elected on a clear commitment to strengthen Canada's economic sovereignty. Our country must have the means to build bigger, stronger and faster. Our supply chains are the backbone of our economy. They rely not only on our ports, our railways and our roads, but also on the workers who keep them running every day. Strong supply chains are therefore critical to our government's plan, a plan that seeks to double our exports to markets other than the United States, to build major projects and to attract more investors to Canada. Basically, Bill C-39 seeks to do one thing and that is strengthen our supply chains. It proposes a more holistic view of our transportation system. Today, we sometimes tend to look at the various components separately, whether it be a port, a railway, a highway or a border crossing. Bill C-39 would instead enable us to look at these infrastructure as different parts of a single trade network. The government could thus officially designate national trade corridors and establish performance measures for those corridors. In practical terms, that means tracking the movement of goods, identifying where delays are occurring, identifying capacity issues and measuring the performance of the entire network.

Bill C-39 would also create a national trade corridors council. Its role would be to monitor the movement of goods, analyze disruptions, identify areas where the system can be improved and make recommendations to the Minister of Transport.

Why does this matter?

This matters because when we invest in our infrastructure, we want to invest in the right place. We want every investment to have the greatest possible impact. The reliability of our trade corridors has a very real impact. A congested port can mean additional costs for businesses. A lack of rail capacity can mean grain sitting in elevators rather than moving to markets. That is why the second major element of Bill C‑39 has to do with our ports. Canadian port authorities are critical to our supply chains. The bill would modernize their governance. It would also give them more trade and financial flexibility. This flexibility would allow them to invest, generate revenue and develop the infrastructure needed for trade. Bill C-39 also creates new indigenous advisory councils, since indigenous communities are essential partners in the development and operation of our transportation infrastructure. Bill C‑39 maintains the role of ports as non-profit organizations. It simply provides them with more opportunities for partnerships and capital projects.

However, infrastructure is only part of the challenge. The other part is the regulatory system around it. Today, a business may have to provide similar information to several departments or agencies. That means a lot more forms, a lot more duplication and much higher administrative costs. Bill C‑39 would allow for better information sharing between authorized public government institutions. Our goal is simple: to reduce the administrative burden and make our processes more efficient.

The bill would also promote paperless trade. It would recognize electronic transferable documents that meet international standards. This means simpler information sharing, less duplication and less paperwork.

We need to build faster. Bill C‑39 also addresses project approval timelines. Bill C‑39 would create a transportation project office within Transport Canada. Its role would be to better coordinate federal authorizations and consultations for transportation projects. The goal is to provide a clearer federal pathway for priority infrastructure and to get projects from the application phase to the decision phase more efficiently.

However, I want to be clear on this point. It is not about eliminating standards. It is about reducing duplication. It is not about removing consultation. Rather, it is about making the process more consistent and predictable, while upholding the standards that we are proud of as Canadians. Canada needs to be able to build faster while continuing to build responsibly.

Lastly, Bill C-39 recognizes an incontrovertible reality: The resilience of our supply chains also depends on security. This bill would modernize Canada's transportation security clearance framework. It would expand the roles to which these clearances can apply, improve risk assessment, strengthen information sharing and provide better tools for granting, denying, suspending or cancelling a clearance. The goal is simple: We need to respond more effectively to complex and ever-changing threats because security is essential to the resilience of our supply chains.

Taken together, these measures offer a practical, coordinated approach to strengthening the economy and making it work better. We need to be able to move goods from farms to silos, from mines to ports, from factories to markets and from our communities to customers around the world. We need a transportation system that can keep pace with our investments and with the opportunities available to us. That means building our capacity, but also making better use of the capacity we already have. It means having the information we need to understand how our corridors work. It also means ensuring that our ports have the necessary tools and flexibility to grow. This means making sure that when we approve and build major transportation projects, we do so with the coordination and predictability that Canadians expect.

That is why strengthening our supply chains is fundamentally about strengthening Canada's economy. It is about building transportation capacity, improving coordination, strengthening our resilience and preparing Canada for the economy of today and the economy of tomorrow.

That is how we are building Canada strong.