The short answer is that we have actually done everything that was recommended in the report and more.
We have done a review of our mandate. We have done site-specific risk assessments. We have done this basin level risk assessment. We have developed a new leading-edge statistical power analysis tool to optimize frequency of monitoring. We are integrating a biomonitoring tool so that we can look at aquatic ecosystem health. We have implemented a quality assurance framework.
We are now in the process of integrating our network design with the risk-based results and data coming out of the system so that we have comprehensive work plans that are data driven and adjusted for risk every single year.