Okay.
I can't comment specifically about the particular cases within B.C. and at the BCUC, but generally with respect to electricity generation, much as I was saying with respect to metering, we have a regulatory system and a regulatory compact that was developed for the industry as it was in the 1960s rather than in 2020. The systems are not flexible, they're not built for innovation, and they're not built to meet the challenges of the future writ large.
Then, with respect to your earlier question about the challenges with getting to test vehicles, we have been partnering with an organization called Plug'n Drive—