We have three main wells in our community that feed the entire community. Two of them were overtaken by the river and as a result, we had to run a boil water advisory. We were able to isolate part of the system, so that the third well could keep that part of the community in fresh water. That was a blessing, because we were able to set up a water filling station. Other than that, we had to rebuild the entire water infrastructure in a different spot, safe from future flooding. Right now, we're undergoing a $6-million project on our last remaining well to make sure it's also flood-proof.
Overall, we'll be close to $10 million by the time all is said and done on that.
