It requires tonnes of steel, concrete, copper and aluminum. In terms of steel, it's probably a bit more than 600,000 tonnes of steel. One third of it would be for the tracks. The rest would be for the structural steel that is required.
February 2nd, 2026 / 6:30 p.m.
President and Chief Executive Officer, VIA HFR – VIA TGF Inc.
It requires tonnes of steel, concrete, copper and aluminum. In terms of steel, it's probably a bit more than 600,000 tonnes of steel. One third of it would be for the tracks. The rest would be for the structural steel that is required.