The modernization would then have cost more had it been spread out through the multiple stations that were there, and so on. Okay.
Does the new system allow for easier integration, should there be a system problem in one of the stations or should there be something that takes one of the control centres out of commission? Does the modernization of the new equipment allow for an easier access to tie in those systems?