I don't believe that was the case. I think that the requirement was removed something like 14 months after the document was signed. I assume that work was already taking place on the contract at that point. Is that not correct?
Taylor Bachrach NDP Skeena—Bulkley Valley, BC
I don't believe that was the case. I think that the requirement was removed something like 14 months after the document was signed. I assume that work was already taking place on the contract at that point. Is that not correct?
See context to find out what was said next.