We do a number of regular testing schedules, what we call ESI. I'm sorry for the acronyms.
On a periodic basis when we develop new software we then do testing of the software. Then we do integrated testing with all of the other software that they interact with. We had one scheduled last fall where all of the updates that were done then were tested before they were rolled out and used for elections. Then after that we had all of the changes done that were necessary for Bill C-76. They were tested within the systems. Then we have integrated testing that is being done right now. It will be done just before the end of February. Then when we do the simulation, we will stress test the systems in a simulated election with the volumes and the peaks and valleys of an election. We will do some security penetration testing as well.