Linda touched on the tunnel access between buildings. Confederation and Justice had a tunnel built a few years ago. I think I mentioned this in the previous meeting. In 2011 they ripped out the lawn between those two buildings. It still hasn't reopened. It was supposed to be closed for a year or two.
That tunnel was built recently, within the timeline of the LTVP, but it was not done in a way that staffers and parliamentarians could use it. Why not? Will there be some remediation of that? What is the long-term plan to have all the buildings interconnected by tunnel?