There's a lot of rock, yes. When it comes to archeology, I thought, well, you don't go down very far before there are no more archeological possibilities. There may be paleontological possibilities. I don't know.
Anyway, here's the thing about it. Once the shovel goes in the ground, once the contracts are given out for the shovel to go in the ground, all of which is scheduled to happen before the election—or at least part of it is scheduled to happen before then—inevitably, many dollars will have been spent that are unrecoverable. The bigger the footprint, the bigger the space we're committing to, even though we do not have a consensus on what should go in there.
I can tell you that, among the things you're showing, I am vigorously opposed to a number of them. Let me tell you, I do not agree with putting the Library of Parliament, which I assume is a museum, there. It's not that we shouldn't have a museum of parliamentary history. As a historian, I love the idea. It's just that there are a lot of other buildings that could go into it. It doesn't have to be attached to the Centre Block.
Viewing rooms to watch parliamentary procedures when there's overflow do not have to be underground there. In the event we think something like that is going to happen, we can set up seating in other places. To go back to the Westminster model, parliament traditionally involved multi-purpose rooms, Westminster Hall being the most obvious and most glorious of them, and that's almost a thousand years old.
On the issue of security, we already have the place people will come in for security reasons. We could put a second spot in, but we have a place that is designed to maximize security. It's well-designed. It serves its purpose well. It's outside of the buildings.
In terms of access from that area to the House of Commons and Senate chambers, well, the Senate is a little more difficult, but for the House of Commons, the tunnel shown there in grey to the west of Centre Block could be a way of accessing viewing areas in the House of Commons, so there's no need to run that in front, underground, which means that you could get that access underground without disrupting Canada's front lawn.
There's room on the side and back, in your plans themselves, for potential pavilions. That might be controversial. I assume those are above ground, but we don't have a chance to speak as to whether that is less intrusive, or to get public feedback. I literally didn't know of this possibility until today.
I know you have a little strip along the belvedere that you've opened up, and I have a personal sentimental reason for wanting that to be open for the next few years. That is the spot where I first kissed my wife, actually, but for the many other people who don't have that particular sentimental attachment, the front lawn is more important.
The pleasure of viewing the side, which is where the Senate extra buildings...that could be done.
On House of Commons committee rooms, none of them should be underground, under what is now the front lawn, because we have a large number of other rooms available to us. Throughout my entire lifetime—and I'm more than half a century old and have lived in Ottawa my whole life—the conference centre, now the Senate, has been sitting there as a great big empty black hole. It's finally being used. Now that it has been reconditioned, we could use that for some committee rooms.
For number 1 Wellington, the old railway tunnel that's being reconditioned, I know we have a lease that expires—in 2034, I think you said—but it's a lease between ourselves and the NCC. We can use those permanently, and they're lovely rooms, so I think we can increase the number of committee rooms easily. In the Macdonald Building, those rooms could be multi-purpose and turned into committee rooms, or at least some of them could be—those in the upstairs part.
You see what I'm getting at. There's lots of room for all these things without doing what is the most intrusive thing of all the different things we're doing here, the most expensive and the one with the least certain timelines.
I know I've used up all of my time, Mr. Chair, but I will say, speaking for myself only, that in my opinion, the absolute.... I would like to see nothing happen with regard to the visitor welcome centre phase two, even if it means missing a building season, until you have the consent of the House of Commons. I feel very strongly about that. If this stuff goes ahead before the next election and we've spent a bunch of money before the House comes back, regardless of which party is in government—it happens—I know that I for one will be distressed.