The issue here is that we build the capacity required in our network to address peak periods. So if the peak period that we anticipate requires a pipe this big, we have to build a pipe that big. That costs a lot of money.
February 10th, 2011 / 5:30 p.m.
Senior Vice-President, Regulatory and Government Affairs, Bell Canada
The issue here is that we build the capacity required in our network to address peak periods. So if the peak period that we anticipate requires a pipe this big, we have to build a pipe that big. That costs a lot of money.
See context to find out what was said next.