No, I'm stating that I was in a period of refinement of the SOR.
The other thing I'll comment on is that if one takes part of a discussion from one period of a process like that, that I've just described, referring to an e-mail string that I was involved in at one period of time in part of this refinement period, and then takes an e-mail from another period and tries to relate them, they are probably very unrelated issues.
The issue we were dealing with on May 1 had nothing to do with the actual abilities of the individual aircraft. It had to do with whether or not we wanted to include tracked vehicles in the requirement. The challenge we had with this is, at that time, tracked vehicles were not considered part of our rapid reaction process, and we realized that if we included all tracked vehicles, including our tanks, that would significantly change the operational requirement for the payload. But the dilemma we had, and the dilemma my staff had presented to me, was that the ADATS, the air defence anti-tank system, could be considered part of our rapid reaction process, and therefore we should be including that.
