I can. Sir, it's quite simple. At the end of operations, we will start in full tempo in terms of withdrawing equipment. You're quite right, it's time and space based on the magnitude.
The chief has already highlighted that our intent in doing the detailed planning now is to do the planning on what materiel can potentially be thinned out while at the same time acknowledging that operations will continue. Sustainment of current operations will be maintained to the last point. There is a clear intent to thin out to the extent possible, to cease operations, and then to put the bulk of our effort in terms of moving that materiel in the timeframe provided.