No. It uses a completely different arresting system and the new system is being engineered into the modernized frigates, which will be the first platform to operate the Cyclone.
But to your point specifically on AOPS, I want to address it because AOPS will be fitted with the next generation of arresting gear once that arresting gear has been fully engineered and tested. The first vessel will be fitted for the equipment and vessels two through six will be fitted with that equipment, based on the schedule that we have at the moment. Vessel one will be retrofitted with that new system once the engineering is finalized on what that new system is going to look like.