Yes.
Most of our surplus water supply is in the summertime, when Manitoba is experiencing light loads, so the transmission line is mainly used in the summertime when we have large surpluses available and limited reservoir storage capability to store the energy. Then in the wintertime, the import capability is there to increase our electricity supply to serve our loads in the wintertime. Both import and export capability are thus used consistently.