We've just engaged in a collaboration with British Columbia and Natural Resources Canada to look at seismic, because there are a series of projects in B.C. on a fault that are running into some difficulty. How do they build these buildings completely out of wood and meet the high seismic zone requirements? We understand that.
Technically, it could be resolved. Right now they do it one-off. The engineer has to come in, look at that building, look at the seismic zone, and say how you will design it. Sometimes that will mean you're going to use a concrete base or it's not going to be all wood.
Over the next 12 months, NRC will come out with a technical guide that will address how to build completely out of wood in the high seismic zones. We have that on our radar. We're starting the work on that.