I would say that in Quebec, at present, our legacy of hydroelectric dams built in the 1960s and 1970s has always allowed us to have very low electricity costs. Of course, these dams need to be renovated and optimized. I don't think this is a political issue. It's a matter of maintaining our dams.
Of course, all electricity is now produced at a higher cost than it was with our first dams built in James Bay. There has been an adjustment to keep the system efficient in Quebec. I do not believe that political factors have led to an increase in the cost of electricity in Quebec.