What generally happened was that we had built out about 30% of renewable power, but we had not kept up with the replacement of coal power plants or natural gas plants. Natural gas plants are not something you can turn on with a switch. It takes anywhere from two to eight hours to get a plant up and running at speed. In winter, that's further complicated by the fact that you have extreme cold outside, where the air intake is, and inside you are running at a very high temperature.
There was a combination of factors. The polar vortex moved in and parked itself over Alberta, the sun went down and the wind died off. We had about 6,000 megawatts of renewables on the grid. Suddenly, all of that vanished, and we did not have sufficient dispatchable gas power to compensate for that.
We had recognized this problem in the fall of 2022, when there were seven grid level three alerts. That's usually when either industry is going to be curtailed or consumers are going to face rolling blackouts—or, God forbid, you face a blackout. If a power grid goes down, it's very hard to get the whole thing up and running again. That's why this kind of provincial or regional attention to reliability and redundancy is so important, because it's not a situation that anyone wants to find themselves in. It's very hard. In Spain and Portugal, it took them over 12 hours to get their power grids back up. A number of people died, and the losses were massive for all industries.