That's correct. If you look at most provinces and most regions, you see that the province takes care of its own first.
Just imagine if we had a national transmission line from Quebec and Ontario, where there's nuclear and generally lots of hydro, and then you have one of those big winter storms in Quebec and Ontario and the other provinces had not built additional capacity. As Manitoba Hydro mentioned, they're kind of up to here. Would we have a national blackout, as Spain and Portugal did?
If you have redundancy and power generation within your own region and you also have sufficient interties to local neighbours, you can draw or contribute small portions. For instance, when we had the big polar vortex in Alberta in January a couple of years ago, we almost went to blackout, but Manitoba supplied a bit of power to Saskatchewan and Saskatchewan supplied a bit of power to Alberta, and that saved us from that cliff.
When you're transporting a lot of electricity, there are huge line losses. If you're transporting on an ultra-high-voltage DC line, which is what's used for wind and solar, you lose power at either end in the inverter in converting it to AC—alternating current—which is what the regular grid runs on. When you have long AC high-voltage lines, you lose transmission because of line losses from the resistance factor, which is an element of physics.
People have said that if we build wind west and have 66 gigawatts from offshore wind, we can supply 20% of the power to Canada. Well, you might only ever get 33 gigawatts of power out of it, with great difficulty, and with great difficulty for the power grid, because what are you going to do if there's a hurricane? What are you going to do if all that wind drops off? Where is the reliable backup to fill that gap?