Thank you very much, Mr. Chair.
I'm going to address all three of you.
I've been here since 2019, I've been hearing about small modular reactors since 2019—and not one has been built yet. If I understand correctly, one is being built in Ontario. So I have questions about Canada's capacity to carry out this type of project.
First, do we have the required workforce and expertise?
Second, if they try to build a new CANDU reactor, how long might it take?
I suppose they can't carry out two projects concurrently, so there must be considerable logistical problems and challenges. So how long does it take to build a small modular reactor? Can two or three be built simultaneously, and is it the same for CANDU technology? How long does it take?
Is it possible to envision building two or three projects at the same time, or is that unthinkable?