That's a good question.
The AP1000 is a reactor that's built already, so you've taken away the design risk. There's no design risk. It's built. It's locked down. It's ready to go. It's licensed in the United States and in the U.K. We have regulatory approval to go ahead with it. We know the fuel that goes into it. We produce it, by the way, which is part of our strategy to build the reactor and then provide the fuel for it.
The risk is on the construction side, as in any large project. The AP1000 can generate 1,100 megawatts, but it requires enriched fuel. We can supply that.
With a CANDU reactor, it depends on which one. Sam talked about, I think, three different varieties they have. I'm not going to say anything about that, because I don't know. They're smaller, for sure. They don't require enriched uranium. They require natural uranium, which we also produce at Cameco.
The difference is that one's a heavy water reactor and requires heavy water, which we also don't produce in Canada right now. We'd have to come up with that somewhere.
They're two different technologies. You know what? In one place, one is the right fit, and in another place, a different one is the right fit. That's why we're of the view that it should be opened up to let the utilities decide what fits best for them. What fits best for Bruce site C? What fits best for Wesleyville? Saskatchewan is going to make a decision, and it's the same thing.
