Thank you for the question.
We have to get started. We have to move from ambition to action, if you want a keyword. We have to get started and get the first one built. We heard about the race to be second or the race to be third. Nobody wants to take the risk on the first one. OPG is taking it on an SMR, so they're going to build that one.
There are three key words: simplify, standardize and sequence. You can't build them all at the same time. It's like what Bruce Power is doing with their refurbs: They're doing one and then moving on to the next one and the next one. You move the workforce along.
That's the same as where we are with building reactors. We do that. We simplify. You have to lock down the design. You can't build a reactor if the design is only 20% complete. It will kill you, and that's what has gotten us into trouble in the past. Standardize and build the same one. Don't let everybody pick their own variety. If you go to the U.S., out of the 94 reactors, I think there are 68 different models. It's terrible.
You have to standardize. That's what the Chinese do. The Chinese can build them in five years for $5 billion. That's about half of what it would be in Canada. You have to do it that way.
We think Canada could probably build four to six at a time, maybe, but you'd have to build them in sequence. You'd start with one, and then a year later you'd start another one. The U.A.E. just did that with their four reactors, and they were successful.
That would be my advice.