Thank you, Chair.
With respect to proposed section 17, it says, “A designated operator must, within a period prescribed by the regulations,” and then it would say “not to exceed 72 hours”.
We've taken “energy” out of this specific section because the regulations require consultation with sector-specific operators anyway, so it would be “not to exceed 72 hours”.