Yes, I was a bit taken aback.
If you read our study, you will see that it has a lot of details on methodology. We were very transparent. We're open to working with them. We can redo some modelling if they wish.
I would say that in all the methodology choices in the report, we were consistently within the minimum threshold. We made extremely cautious choices at all times.
Assuming the six projects are undertaken and we meet again in five years' time, are we going to see similar results as those in the study? I think we'll have more striking results because our methodology choices were very cautious.
