As a result of the comprehensive expenditure review, the CSA is expected to save $41 million by 2029-30 and then, after that, $8.3 million ongoing. Savings were achieved by terminating and scaling down some projects as well as optimizing our workforce. It reflects the challenging budget decisions that had to be made.
I can say that we learned a lot through the work that was done on the project. In other words, technology was advanced that could feed into other projects, including the lunar utility vehicle, a $1.2-billion vehicle that is planned for the lunar surface, and the science continues. The science projects that were funded—