With respect to slide 7 on your deck, Mr. Percy, you make two points. You mentioned the fact that “Metrolinx's trains must operate over some track owned by federally-regulated commercial railways”. Then, “If and when these tracks are found in disrepair, host railways may impose interim safety measures such as 'slow orders' before investing in major repairs or upgrades”.
How much stress does that place on your system?