Mr. Speaker, thousands of jobs in Ontario depend on the operation of Enbridge's Line 5. In November, the governor of Michigan decided to revoke the easement, which has allowed this pipeline to operate safely for decades. Line 5 was not mentioned in the Prime Minister's readout of his call with President Biden last week, or his call with John Kerry last night.
Specifically, why has Line 5, the thousands of jobs, the decades of a safe record, not been a priority for the Prime Minister?