Madam Chair, we continue to monitor these ships as they are being built. The estimate for the ships that I believe the member is referring to, the two vessels, is projected to be $1.5 billion. We are going to continue to monitor the situation and ensure that the ships being built are required.
There may be instances, for certain ships being built, that the design changes, but we continue to work with the shipyard. We are also continuously monitoring the price to see if the ships are over budget. We are constantly looking at that and determining what is bringing them over budget, and we are keeping a close eye on it so we can continue to work with the shipyards and they can deliver things as quickly as possible and respond to the specs.