Is four years too long? It depends on the project. For some, it is.
For example, in the Quebec City region, there is still talk of a third link. The governing party is in the midst of a leadership race. Not all projects are structured in the same way. Not all projects require the same speed or the same level of verification. Not all projects are of the same scope either.
A high-speed train that would cross a huge swath of the country is not something that can be taken lightly. I cannot emphasize this enough: We must be careful with the broad powers and blank cheque granted to the government in the legislative framework that has already been adopted or is about to be voted on and that will allow such measures to be imposed.