Building Canada Strong Act

An Act respecting certain measures to strengthen the economy

Sponsor

Steven MacKinnon  Liberal

Status

In committee (House), as of Oct. 8, 2026

Subscribe to a feed (what's a feed?) of speeches and votes in the House related to Bill C-39.

Summary

This is from the published bill. The Library of Parliament has also written a full legislative summary of the bill.

Part 1 implements certain measures in relation to project evaluations.
Division 1 of Part 1 amends the Impact Assessment Act to, among other things,
(a) provide that the Canadian Nuclear Safety Commission is to conduct the impact assessment of a designated project that includes activities that are regulated under the Nuclear Safety and Control Act ;
(b) authorize the Minister of the Environment to grant certain federal authorizations that are required in respect of a designated project at the same time that the Minister issues a decision statement in respect of the project;
(c) ensure that a decision statement in respect of a designated project for which the Impact Assessment Agency of Canada conducts the impact assessment is issued within one year after the proponent provides the required information or studies;
(d) provide for the coordination of the impact assessment of designated projects and the review processes for certain federal authorizations that are required in respect of those projects; and
(e) provide for the coordination of consultations with Indigenous groups.
Division 2 of Part 1 amends the Building Canada Act to, among other things,
(a) establish, for certain types of projects located within a region of national interest, a similar framework to the one applicable to national interest projects;
(b) allow the minister designated under that Act to add, remove or amend any condition in respect of an authorization that was granted for a national interest project before the name of that project was added to Schedule 1 to that Act;
(c) ensure that obligations to make information public associated with decisions made under that Act are administratively feasible; and
(d) authorize the Governor in Council to add the name of a region to a new schedule to that Act if the Governor in Council is of the opinion, having regard to certain factors, that the designation of that region is in the national interest.
Division 3 of Part 1 amends the Canadian Energy Regulator Act to, among other things,
(a) ensure decisions in respect of pipelines, designated power lines and offshore renewable energy projects are issued within one year of receiving the required information and studies;
(b) provide for the coordination of consultations with Indigenous peoples of Canada in respect of pipelines, designated power lines and offshore renewable energy projects;
(c) provide for the coordination of federal authorizations in respect of pipelines, designated power lines and offshore renewable energy projects with federal authorities;
(d) provide that the Commission is the sole assessor of applications in respect of pipelines, designated power lines and offshore renewable energy projects;
(e) provide authority for the Commission to
(i) make decisions in respect of applications relating to pipelines, designated power lines and offshore renewable energy projects, unless otherwise specified in the Act,
(ii) exempt certain pipelines or branches of or extensions to pipelines from the application of certain provisions, and
(iii) integrate a detailed route hearing into an ongoing hearing; and
(f) provide that the Governor in Council is to determine whether certain pipelines and designated power lines are in the public interest.
It also makes consequential amendments to the Federal Courts Act and the Northern Pipeline Act .
Division 4 of Part 1 amends the Canadian Navigable Waters Act to require the Minister of Transport to, among other things, take into account the feasibility of the terms and conditions in respect of an approval relating to certain works. It also transfers to that Minister the power to exempt bodies of water from the application of certain provisions of the Act if that Minister is satisfied that it would be in the public interest. Finally, it allows the Governor in Council to make regulations to exclude structures, devices or other things from the definition “work” to avoid duplication with other Acts and regulations.
Division 5 of Part 1 amends the Canadian Environmental Protection Act, 1999 to, among other things,
(a) ensure that environmental protection compliance orders may be issued with respect to any thing to which that Act applies and to non-continuing offences, including with respect to contravening imports;
(b) broaden the scope of such orders by permitting an enforcement officer to direct a person to take additional measures, such as managing contravening imports in the manner specified in the order, returning them to their place of origin or removing them from Canada; and
(c) provide that certain permits issued under that Act may, in certain circumstances, be valid for more than one year.
Division 6 of Part 1 amends the Species at Risk Act to, among other things, require the competent minister to take into account the feasibility of the terms and conditions in respect of certain agreements and permits.
Division 7 of Part 1 amends the Fisheries Act to, among other things,
(a) modify the fish habitat bank regime to allow for the use of habitat credits by third parties;
(b) authorize the making of regulations respecting the circumstances in which a person who is authorized to carry on a work, undertaking or activity may pay a fee to offset adverse effects on fish and fish habitat and provide for these fees to be credited to the Environmental Damages Fund; and
(c) transfer certain regulation-making powers from the Governor in Council to the Minister of Fisheries and Oceans.
Part 2 implements certain measures in relation to supply chains.
Division 1 of Part 2 amends the Department of Transport Act to provide the Minister of Transport with the power to establish a transportation project office that coordinates review processes for federal authorizations and consultations with respect to transportation projects.
Division 2 of Part 2 amends the Canada Transportation Act to, among other things,
(a) provide that the Minister of Transport may designate geographic areas as trade corridors and establish the National Trade Corridors Council, whose mandate is to monitor the movement of goods in trade corridors, analyze disruptions that may affect trade corridors and make recommendations and provide advice to that Minister;
(b) provide that Minister with the authority to make regulations to give effect to international standards or ensure compliance with Canada’s international obligations;
(c) expand the purposes for which that Minister may request that federal departments and agencies provide information that has already been provided by regulated entities to those federal departments and agencies;
(d) clarify the application of the requirement to notify that Minister of proposed transactions involving transportation undertakings;
(e) reduce the threshold for the requirement to notify that Minister and the Commissioner of Competition of proposed transactions involving transportation undertakings situated in a “port”, as defined in section 5 of the Canada Marine Act ;
(f) provide that that Minister may, for any purpose related to transportation security or safety, to the integrity of the national transportation system or to public safety or for any purpose specified by order, grant, suspend or cancel security clearances;
(g) authorize, for the purposes of administering and enforcing the security clearances regime, certain individuals or entities to collect information from and disclose information to each other;
(h) authorize the Governor in Council to make regulations respecting security clearances;
(i) expand the exceptions to the requirement to obtain the Canadian Transportation Agency’s approval for the construction of railway lines; and
(j) establish, for a period of four years, a zone in Manitoba, Saskatchewan and Alberta in which any interswitching that occurs is subject to the rate determined by the Canadian Transportation Agency.
Division 3 of Part 2 amends the Canada Marine Act to, among other things,
(a) authorize the Governor in Council to allow a port authority to enter into joint-liability arrangements and to create entities other than wholly-owned subsidiaries to undertake activities within or outside the limits of the port;
(b) authorize the Minister of Transport to appoint certain directors of a port authority;
(c) add principles that a port authority must observe when fixing port fees and expand the grounds on which a fee-related complaint may be filed with the Canadian Transportation Agency;
(d) authorize the Governor in Council to appoint, in certain circumstances, an administrator for a not-for-profit corporation that has entered into an agreement in respect of the St. Lawrence Seaway;
(e) authorize that Minister to terminate such an agreement or any part of one and provide for a dispute resolution process to deal with any disputes arising from the termination; and
(f) authorize that Minister to require that any of the following persons take measures to prevent or mitigate certain threats or stop any activity that would contribute to such threats:
(i) a port authority,
(ii) a person in charge of a port facility,
(iii) a person responsible for the management and operation of all or part of the St. Lawrence Seaway or for any works, undertakings or property used in the operation of the Seaway,
(iv) an occupier or person in charge of any federal real property, or any federal immovable, that is subject to being administered under Part 3 of that Act.
It also makes consequential amendments to the Port Authorities Operations Regulations .
Division 4 of Part 2 amends the Marine Liability Act to, among other things,
(a) modify the definition “receiver” to refer to the person who physically receives bulk hazardous and noxious substances carried by sea as cargo and discharged at a port or terminal in Canada; and
(b) harmonize the inspection and enforcement provisions relating to that person.
It also makes related amendments to the Safeguarding Canada’s Seas and Skies Act .
Division 5 of Part 2 amends the Coasting Trade Act to allow foreign ships or non-duty paid ships to engage, without a licence, in activities in response to a declared emergency.
Division 6 of Part 2 repeals the Shipping Conferences Exemption Act, 1987 and makes a consequential amendment to the Access to Information Act .
Division 7 of Part 2 amends the International Bridges and Tunnels Act to allow the Minister of Transport to make certain decisions that were previously made exclusively by the Governor in Council.
Division 8 of Part 2 enacts the Enabling Digital Trade Act which, among other things,
(a) sets out the rules for the use of electronic trade documents as the functional equivalents to paper trade documents that are related to trade in goods;
(b) eliminates the requirement to provide information to the Government of Canada in physical form in relation to the importation or exportation of goods; and
(c) permits a federal minister, or an officer or employee of a department or agency of the Government of Canada, to disclose information that is related to the importation or exportation of goods if the receiving minister, department or agency of the government is permitted by law to collect that information.
Part 3 implements certain measures related to the work force.
Division 1 of Part 3 amends the Canada Labour Code to, among other things,
(a) establish new requirements and timelines related to collective bargaining;
(b) provide for the transfer of certain rights in the context of certain contractors being replaced by new contractors;
(c) establish new requirements and authorities in relation to entering into first collective agreements;
(d) provide that the Canada Industrial Relations Board may certify a trade union as the bargaining agent for existing bargaining units in certain industries in certain geographic areas on application of two or more employers, on referral of the Minister of Labour or on that Board’s initiative;
(e) confer on the Minister of Labour the power to appoint a special mediator to assist parties in settling a dispute that arises in connection with the entering into, renewal or revision of a collective agreement; and
(f) establish new requirements for that Minister to direct the Canada Industrial Relations Board to take measures under section 107 of that Act.
It also makes consequential amendments to certain regulations.
Division 2 of Part 3 amends the Canada Labour Code to, among other things,
(a) authorize the Head of Compliance and Enforcement to issue a settlement enforcement order requiring an employer or director of a corporation to pay any outstanding amounts that are to be paid under a settlement with an employee; and
(b) permit an order to debtor to be issued, in certain circumstances, before a settlement enforcement order or payment order has been issued.
Division 3 of Part 3 provides that Division XIII of Part III of the Canada Labour Code does not apply to an employer and employees who are parties to a collective agreement that confers rights and benefits at least as favourable as those conferred by that Division XIII with respect to medical leave of absence with pay.
Division 4 of Part 3 amends the Wage Earner Protection Program Act to, among other things, define the term “former employer” for the purposes of that Act and to specify that the Minister may confirm, vary or rescind a determination of eligibility even without a request for review.

Elsewhere

All sorts of information on this bill is available at LEGISinfo, an excellent resource from Parliament. You can also read the full text of the bill.

Bill numbers are reused for different bills each new session. Perhaps you were looking for one of these other C-39s:

C-39 (2023) Law An Act to amend An Act to amend the Criminal Code (medical assistance in dying)
C-39 (2017) An Act to amend the Criminal Code (unconstitutional provisions) and to make consequential amendments to other Acts
C-39 (2014) Law Appropriation Act No.3 , 2014-15
C-39 (2012) Law Restoring Rail Service Act

Votes

Oct. 8, 2026 Passed 2nd reading of Bill C-39, An Act respecting certain measures to strengthen the economy

Debate Summary

line drawing of robot

This is a computer-generated summary of the speeches below. Usually it’s accurate, but every now and then it’ll contain inaccuracies or total fabrications.

Bill C-39 proposes coordinated federal reviews with targeted timelines for major projects, changes to transportation corridors, ports, trade digitization and security, and amendments to federal labour rules concerning bargaining, dispute resolution and worker protections.

Liberal

  • Supports faster project approvals: Supports a coordinated “one project, one review, one year” process to attract investment and build infrastructure faster, while maintaining environmental standards and Indigenous rights and consultation.
  • Modernizes trade corridors: Would designate national trade corridors, improve port governance and coordination, and digitize trade processes to reduce bottlenecks, strengthen supply chains and diversify exports beyond the United States.
  • Protects workers and bargaining: Supports earlier bargaining, mediation and stronger workplace protections to improve labour stability, while affirming workers’ right to strike and adding guardrails to exceptional government intervention.

Conservative

  • Supports building projects: Conservatives support faster construction, investment and jobs, but will judge Bill C-39 by measurable results rather than announcements, and say the previous Bill C-5 has delivered little.
  • Questions timeline guarantees: They argue the one-year approval promise is not binding: preparation occurs before the clock starts, and officials or cabinet can pause or extend it, leaving investors without certainty.
  • Wants deeper deregulation: Conservatives call for repealing Bills C-69 and C-48 and the industrial carbon tax, with one project, one review and firm approval deadlines instead of more bureaucratic workarounds.
  • Demands scrutiny of labour changes: Members warn that changes to section 107 could weaken collective bargaining and workers’ right to strike, and demand thorough committee study, consultation and safeguards before decisions are made.

NDP

  • Opposes bill C-39: The NDP argues the bill concentrates power in ministers, weakens workers’ rights, risks environmental safeguards and Indigenous rights, and transfers decision-making away from communities and independent experts.
  • Protects the right to strike: The party opposes codifying and expanding ministerial powers to end legal strikes, saying this undermines constitutionally protected rights, weakens workers’ bargaining leverage and discourages employers from negotiating fairly.
  • Safeguards environment and Indigenous rights: The NDP warns that fixed approval deadlines, weakened project conditions and accelerated consultation could harm ecosystems and compress Indigenous rights; it says meaningful consultation and environmental review are essential to responsible development.
  • Builds fairly and together: The party supports building housing, clean energy and infrastructure, but says nation-building must create good union jobs, respect Indigenous rights, protect the environment and include communities rather than prioritize speed and corporate rewards.

Bloc

  • Opposes Bill C-39: The Bloc will vote against Bill C-39, arguing that it uses the trade crisis to justify permanent changes that weaken environmental protections, workers’ rights and democratic accountability.
  • Environmental safeguards: The Bloc warns that rushed assessments, project pre-approval and shifting reviews to energy regulators undermine scientific independence, public consultation and the ability to prevent environmental harm.
  • Right to strike: The Bloc says the bill gives ministers broad discretion to end lawful strikes based on undefined national-interest criteria, weakening collective bargaining and shifting power toward employers.
  • Executive power and Quebec: The Bloc objects to concentrating authority in ministers and the Prime Minister, circumventing Parliament and laws, and intruding on Quebec and provincial roles in managing natural resources.

Green

  • Opposes rushed project approvals: The Green Party warns that Bill C-39 could direct billions in public money to projects without basic cost-benefit analysis, risking economic waste and serious environmental and Indigenous-rights harms.
  • Demands evidence and transparency: The party rejects the premise that speed is inherently beneficial, arguing that weak planning, political pressure and cabinet discretion without transparent evidence make major projects more likely to fail.
  • Protects environmental conditions: The Greens oppose amendments that make project approval conditions subject to tests of economic feasibility or practicality, warning proponents could challenge binding safeguards and weaken environmental laws.
  • Defends collective bargaining: The party supports the Canadian Labour Congress’s concerns about part 3’s threat to collective bargaining and the trade union movement, and calls for substantial amendments.
Was this summary helpful and accurate?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:15 p.m.

Bloc

Mario Beaulieu Bloc La Pointe-de-l'Île, QC

Mr. Speaker, Bill C‑5 allowed the government to circumvent at least 12 laws and seven environmental regulations. It had discretionary power to do so, which was limited to five years. Bill C‑39 removes that limit and makes permanent the ability to circumvent environmental laws.

Does my colleague not agree that, at this stage, given that we are experiencing a climate emergency, this would lead to even more climate disasters, which would bring with it an enormous cost for public services?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:15 p.m.

Liberal

Judy Sgro Liberal Humber River—Black Creek, ON

Mr. Speaker, I believe that all of us have mutual concerns about protecting the environment regarding Bill C-5, Bill C-39 or any other legislation that goes forward that is expedited. However, at the same time, there are different ways of doing things, and I think a lot of the protections we have around the environment remain there and move forward.

I am very confident, in hearing the Minister of the Environment, who is very keen on protecting the environment, that the things that would protect the environment as we move forward are in the bill.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:15 p.m.

Liberal

Terry Beech Liberal Burnaby North—Seymour, BC

Mr. Speaker, the hon. member and I we were seatmates for almost a year and a half, and because of that, I know how experienced she is. In fact, she is one of the most experienced members of the House.

We are in unprecedented times. I would like to hear the member's reflections on something, given the vastness of her experience. If we talk about the speed at which the government is moving, the focus that we have in creating prosperity and creating good, high-paying jobs, what is the importance of that as it relates to this legislation?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:15 p.m.

Liberal

Judy Sgro Liberal Humber River—Black Creek, ON

Mr. Speaker, let me say very clearly that I am so happy that Bill C-39 is moving forward. It will be 26 years next month that I have been here as a member of Parliament, and it takes forever to get anything done. There can be many great intentions, but it takes 10 years to get anything done here, and that is not the way we build a country.

If I were to invest somewhere, I would want to invest somewhere where I know things are going to move along quickly. In past practice, over 26 years, everything that I thought would happen quickly, in one year, two years or three years, has taken years. It is overdiscussed and overprocessed.

I am very glad that Bill C-39 is moving forward. We have to make sure we do things right, protect our interests and protect the environment, but I believe we can do it all at the same time.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:20 p.m.

Conservative

Ellis Ross Conservative Skeena—Bulkley Valley, BC

Mr. Speaker, in talking about indigenous consultation, there was a story that came out that said that the consultation for the Pacific link pipeline to Vancouver was going to be two months long. Does that reflect meaningful consultation of aboriginal rights and title?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:20 p.m.

Liberal

Judy Sgro Liberal Humber River—Black Creek, ON

Mr. Speaker, I just have to say to the member for Skeena—Bulkley Valley that I was used to seeing someone else when the riding of Skeena—Bulkley Valley was mentioned, so it is nice to see the new member there.

Two months is not sufficient. I also do not believe three-quarters to 90% of what I read in newspapers or on social media, because there is so much disinformation and wrong information that unless I know something 100%, I just dismiss it.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:20 p.m.

Conservative

Glen Motz Conservative Medicine Hat—Cardston—Warner, AB

Mr. Speaker, it is always a pleasure to rise and speak on behalf of the good people of Medicine Hat—Cardston—Warner on an issue that greatly affects them as proud Canadians, as Albertans and certainly as concerned citizens.

Bill C-39 is the latest attempt by the Liberal government to deliver on its promises to build the nation-building projects Canada desperately needs. We face an unpredictable trade situation abroad and an even less hospitable environment for our resources here at home.

My constituents deserve certainty that the projects the Prime Minister promised, along with the jobs and economic opportunities they represent, will be given the green light without further delay or red tape. Conservatives have been taking the time to carefully examine this extensive bill. However, like most of the government's legislation, its sweeping powers and lofty promises are overshadowed by a critical lack of results. Actions really do speak louder than words, as the government has yet to demonstrate that it can deliver on the commitments it has already made. Canadians are left, therefore, to wonder if Bill C-39 would actually create the change we have been patiently waiting for.

The bill claims to address long-standing structural barriers that are impeding investment and productivity. It also purports to increase our capacity to meet the demands of new and expanding trade opportunities. In preparation for this bill, the government said, it conducted a series of consultations from April to August of this year. It met with indigenous Canadians, the provinces and territories, and other key stakeholders. The Liberals claim that it drafted Bill C-39 in line with the priorities their consultations identified. Those consultations revealed several priorities that Conservatives have actually long championed.

Canadians support stronger trade corridors while keeping safeguards in place. This would include a stronger hand for indigenous communities in governing trade corridors, protecting the environment, reducing barriers for indigenous employment and speeding up approvals. They also want one-year approval time limits through coordinated project reviews, one Crown consultation process, the designation of regions of national interest, and one final ministerial decision, all while maintaining environmental standards and indigenous rights.

This has largely been the Conservative plan since before the escalation of the current trade war. While we are thankful that the government has so frequently stolen our ideas, all is not what it seems. As with much of the government's legislation, what may appear to be common sense comes with strings attached. In the case of Bill C-39, the pattern is no different. The Liberals have chosen to inject an unhealthy dose of red tape and bureaucracy into a process that should be industry-led and results-driven. Like Bill C-5 before it, Bill C-39 would do absolutely nothing to repeal the “no more pipelines” bill, Bill C-69; the west coast tanker ban, Bill C-48; the industrial carbon tax; and other federal obstacles that block or penalize development.

Let us examine the proposed creation of the so-called national trade corridor council, for instance. While the government presents it as a mechanism for improving coordination between ports, railways, trucking, airports and other transportation providers, the Railway Association of Canada has raised concerns that the council could introduce unnecessary bureaucracy and government interference in supply chain operations.

Let us think about that. At a time when the government says it wants to reduce red tape, attract investment and get goods moving faster, it is proposing a new layer of government oversight through yet another federal council. The question is not whether Canada needs more efficient trade corridors. Of course it does. The question is whether creating another advisory body is the answer, when it would have no direct authority to resolve the problems it has identified. Canadians have heard those promises before. They deserve results, not another announcement of a committee that would study the problems everybody already knows exist.

The Leader of the Opposition likened the bill to a case of déjà vu, and for good reason. Just over a year ago, we debated Bill C-5, the One Canadian Economy Act. The Prime Minister told Canadians that this legislation would cut through red tape, accelerate approvals and allow us to build major projects at speeds not seen in generations, yet here we are, debating another sweeping piece of legislation promising to deliver what the last one failed to achieve.

Canadians are asking a simple question: If the government already had the tools to build the projects through Bill C-5, why has it accomplished so little, and why is it back in Parliament asking for further powers through Bill C-39?

As with its predecessor, we have every reason to believe this bill will do little to move the needle. Its promise of one project, one decision in one year is not as advertised. The clock only starts once the proponent has completed the work necessary to satisfy the government's requirements. The time spent preparing that application, navigating preliminary requirements and addressing outstanding information requests is not captured in the one-year promise. Even when the clock starts, the legislation provides mechanisms for timelines to be paused or extended, including when additional information or consultation is required. In effect, the one-year timeline does not necessarily represent the total time a project will spend navigating the federal approval process.

Canadians should not assume that the one-year promise means that a project will receive a decision within one year of entering the federal system, and the government should not advertise it as such either. It may even result in serious ramifications. When a company cannot obtain timely decisions in Canada, it does not necessarily wait indefinitely. It may invest elsewhere. The jobs, tax revenue, supply chain opportunities and economic activity that would have accompanied that investment can go, along with that company, and once those opportunities are lost, no amount of legislation can guarantee that they will return.

We have seen the real-world effects of a persistent antidevelopment posture in Ottawa. The government turned away $70 billion in investment from the UAE because Canada supposedly has a lack of projects available for investment. Even with the powers at its disposal to approve national projects, a decade of Liberal antidevelopment laws, delays and uncertainty has severely damaged our ability to get shovels in the ground so that Canadians can benefit from investment in our country.

Canada can get nation building right. Conservatives have done it before and know what it takes. Through a one-and-done plan involving one project, a one-page application form and one approval, the previous Conservative government saw 23,500 projects through from concept to completion in under two years, with no environmental mishaps and no public safety issues. That is what decisive leadership and a results-driven approach can accomplish.

Canadians know the Conservative position has been consistent. Through our economic action plan, we would green-light the 500 projects awaiting federal permits, end the industrial carbon tax and repeal the job-killing antidevelopment laws that have hampered our country for years.

Our approach is simple. We are considering Bill C-39 and every other piece of legislation in the context of whether it builds a country that is affordable, delivers stronger paycheques and supports an economy that protects jobs and rewards hard work. Bill C-39 may contain measures worthy of consideration. Conservatives will examine those measures carefully, because our objective has not changed. We want to see projects approved, shovels in the ground and Canadians at work.

Our economy cannot rely on a continuous cycle of announcements, empty promises and disappointments. Canada has an abundance of the resources the world needs. We have the expertise to develop them responsibly, the workforce to build the infrastructure and the geographic advantages to serve markets around the globe. What we need is a federal government that can translate those advantages into results. The government has already had the opportunity to deliver on the promise of Bill C-5. Until Canadians see those results, they are entitled to question whether Bill C-39 represents a genuine change in direction or simply another chapter in the same story.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:30 p.m.

Liberal

Marcus Powlowski Liberal Thunder Bay—Rainy River, ON

Mr. Speaker, a few weeks ago, I was at the port of Thunder Bay and saw these giant windmill blades that were on their way to Alberta through the port of Thunder Bay. However, the port of Thunder Bay is underutilized and the Great Lakes St. Lawrence Seaway is functioning at only 50% capacity.

Alberta grain has long gone through Thunder Bay, but there is basically no container traffic on the Great Lakes. Does the member think some attention to the national trade corridors would be to the benefit of Alberta and the people of Thunder Bay in Ontario?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:30 p.m.

Conservative

Glen Motz Conservative Medicine Hat—Cardston—Warner, AB

Mr. Speaker, absolutely. We have been saying for years that the trade corridors are critical. The rail lines are backed up. The ports are backed up. Vancouver's is, especially. Improving access to markets for our producers, farmers and manufacturers is critical. The issue is whether it will happen.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:30 p.m.

Bloc

Mario Beaulieu Bloc La Pointe-de-l'Île, QC

Mr. Speaker, I listened to my colleague's remarks. I wonder, does he see any value in environmental assessments or does he think it is just a way of delaying projects?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:30 p.m.

Conservative

Glen Motz Conservative Medicine Hat—Cardston—Warner, AB

Mr. Speaker, that is an interesting question. The whole idea behind an environmental assessment is to ensure that the proponent in a project takes into equal consideration not only the impact that project will have on the environment immediately, but the long-term impacts it might have on the environment. My assumption is that those assessments are absolutely necessary. They should not be shortchanged. However, they can be done with more speed to them and without causing a significant impact on the environment, if any.

I cannot speak for the government. I will not speak for the government. I do not know how it assesses its environmental impacts, but I am left to wonder whether they actually get done in a timely manner as well as they could or should.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:30 p.m.

Conservative

Dan Albas Conservative Okanagan Lake West—South Kelowna, BC

Mr. Speaker, I certainly appreciate the member raising the tens of thousands of projects that were done under the Harper government's economic action plan, considering that the environment commissioner actually did a review of all of them and found that there were no issues whatsoever environmentally. I wanted to reiterate that.

The member has also spoken about the red tape and the top-down bureaucracy the Liberal government seems to always be attracted to. The national trade office, which is optional in Bill C-39, has no formal authority, yet it is supposed to somehow facilitate discussions within the same department of Transport Canada.

Does the member not think this is a real lost opportunity to have a single window that can actually get things done? Are the Liberals just creating more bureaucracy?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:30 p.m.

Conservative

Glen Motz Conservative Medicine Hat—Cardston—Warner, AB

Mr. Speaker, what has been troubling in the years I have been here is that the good intentions of any government get bogged down in bureaucracy, and this is a prime example.

Look at the national trade corridor council. I do not see any value in this council adding to the speed of projects or getting any projects completed at all. There are mechanisms in place already. How can a council speed things up when it adds another layer to go through and has more questions, delaying projects further? How it is advantageous to our Canadian economy and to getting projects built is beyond me. I think it is a colossal failure, again.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:30 p.m.

Liberal

Sima Acan Liberal Oakville West, ON

Mr. Speaker, I appreciate my colleague's public service and I appreciated our constructive discussions on lawful access last year.

We share the goals of getting projects done fast, building Canada strong and reducing unnecessary delays. Bill C-5 established a framework for designated national interest projects, while Bill C-39 would also improve coordination across the broader federal review and permitting systems.

Setting aside our differences on other policies, does the member agree that running reviews concurrently and reducing duplication between departments would benefit Canadian businesses? If he doubts the process timelines, what specific changes would he recommend to make them achievable?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 5:35 p.m.

Conservative

Glen Motz Conservative Medicine Hat—Cardston—Warner, AB

Mr. Speaker, what I am having trouble with, and what I think Canadians are going to have trouble with, is how we can improve the speed to get projects approved if we add a third layer of bureaucracy, because that is exactly what this bill would do. It troubles me that Bill C-5 did not seem to get it done, so let us add another layer in Bill C-39.

This is what I believe is happening here. I am hopeful that it will work, but the results are in the pudding, and right now, the pudding is—