Essentially there weren't a whole lot of individual consultations with members. The administration at the time was looking at the consultations that happened pre-2001. In 2001 established standards were approved at the board level, and those were the standards we were working with to get through the design of the West Block in the early years, and that then went up at a higher level for decision-making—not in the granularity, but through the Board of Internal Economy.
