Given where we are in the program, I would concur with Mr. Dicaire. From a design perspective, the chamber is a very significant undertaking and design challenge for us, but we're making good strides.
Moving more to the project side, those of you who came to the site to visit us today saw that we were doing a lot of work in the basement to stabilize the building and add base isolation so we can excavate underneath and link the new Parliament welcome centre to Centre Block. That is probably one of the most technical undertakings in the world right now, from a structural perspective. The slab is going from this big to several feet—about a metre and half wide, I would say. While we're doing that, we have to dig to a three-millimetre tolerance for the building. We cannot shake the building as we're digging beneath it.
We will be very happy to complete that excavation process, get out of the basement and complete the structural reinforcement of the building.