Thank you, Mr. Chair.
I have speaking notes for this. If you'll indulge me, I'll go through them.
Thank you, Mr. Chair and members of the committee. I appreciate the opportunity to provide this update on behalf of the working group on the Centre Block rehabilitation and the long term vision and plan, or LTVP. We understand that members of this committee have a strong interest in the LTVP and what Centre Block will look like when it reopens, how much will remain familiar, what will be restored or modernized, how the building is being adapted to meet future needs and how costs are being managed.
These considerations have been central to the working group’s deliberations, particularly with respect to the chamber, the galleries, the lobbies and the integration of family-friendly amenities, modern workspaces for members including enhanced technology, circulation, safety and security improvements, as well as accessibility enhancements.
The working group was established by the Board of Internal Economy in March 2020 to examine and provide recommendations on the broader long term vision and plan and the Centre Block rehabilitation. It includes members from all recognized parties and is chaired by the Speaker or their delegate, with the chief executive administrator of the House serving as secretary. While the board retains ultimate decision-making authority, the working group plays a central role in developing and presenting recommendations to the BOIE to ensure that the parliamentary perspective and requirements are consistently reflected in the LTVP and its projects.
Since the 2022 appearance of the working group before this committee, BOIE has approved recommendations related to the material handling strategy and the preferred tunnel alignments. In Centre Block and the Parliament Welcome Centre, the board approved the food service locations, including a new public cafe and the creation of new flexible workspaces for parliamentarians in the courtyard infill. The board also approved the seating approach for the chamber and the galleries, the configuration of the two-story lobbies, the number, location, and configuration of House officers suites and parliamentarian office units, and the processes governing the treatment of art and artefacts. In 2024, decisions were also taken on accessibility improvements for the Memorial Chamber and Peace Tower, lobby layouts, multimedia enablement, circulation, and strategies for the rehabilitation of heritage spaces and the landscape design.
Most recently, in 2025, the board approved the long term vision and plan update. As part of that update, members were provided with an overview of the planning work under way for Block 2, which refers to the city block bounded by Wellington Street and Sparks Street, between Metcalfe and O’Connor Streets. Block 2 contains eleven buildings, nine of which are designated federal heritage structures, including the former U.S. Embassy at 100 Wellington, the Wellington Building Annex, the Central Building, the Metropolitan Life Building, the Gibson Building, the Hope Building, the Edwards Building, the Bate Building and the Postal Station B façade. The redevelopment of this block will provide parliamentarian office units, while integrating and respecting the heritage character of the existing buildings.
In addition, the board endorsed the establishment of a dedicated indigenous cultural and ceremonial space in Centre Block and provided guidance on sustainability, cost optimization and several matters related to the Centre Block landscape and forecourt.
The working group remains committed to ensuring that decisions are grounded in parliamentary requirements, respect the heritage of this national institution and site, and meet the long-term needs of members.
With that overview, I will now turn to the chief information officer, Benoit Dicaire, responsible for real property services, who will describe the House administration’s technical role in the LTVP and the projects.