Thank you very much for the question.
The heritage restoration of Centre Block is certainly at the heart of the work that's going on. That needs to be done in balance with a whole host of other elements, like universal accessibility, sustainability, security and all of the functional requirements, but it remains at the core.
As you mentioned, there's high-heritage space. There are 50 high-heritage spaces within Centre Block and about 22,000 heritage assets. That can sometimes be a one-off like the heritage ceiling of the chambers, or it can be the 53 bells in the Peace Tower that we mentioned, or it can be the 35,000 marble tiles that are in the building. There's a broad range of those heritage assets and they all have a specific conservation strategy. Many are removed from the building to be restored off-site, but much remains in the building, protected, and will be restored on site.
To your point about 2019 versus the earlier eras of the building, certainly in some of the high-heritage spaces the conservators have found that some of the earlier, very beautiful work was covered up, sometimes by paint, because things were getting a little old. Parliament has to continue operating and there are only very short time periods, like breaks over the holidays or the summer, so sometimes paint would be applied on top of that. They have gone in behind and scraped that away. Part of the strategy, in many cases, is to actually take it back to its original design intent.
We often get the question of whether we are going to protect the heritage as it was in 2019. As I said to you last week, the answer is kind of “yes and no”. Where appropriate, sometimes we're going to try to take that back to its original intent from the 1920s—almost 100 years ago.